On Track: Athletic Field Improvements for MSU

Athletic Field Improvements

PHOTOS COURTESY OF MISSOURI STATE UNIVERSITY

Missouri State University (MSU) in Springfield, home of the Bears, is launching its 2014-2015 academic year with the debut of several new athletic and recreation facilities in the school’s largest athletics and recreational improvement project to date. It includes a new track and three synthetic turf fields, all installed by St. Louis-based Byrne & Jones Sports. The work is part of $24 million in new construction and improvements to the campus.

“Wet weather challenged the project in the spring and early summer, but Byrne & Jones was able to ramp up manpower quickly and optimize its productivity to take full advantage of dryer weather and deliver the project on time,” says Kyle Moats, MSU director of athletics. “The entire building team pulled together to ensure the students’ commitment to fund the project was rewarded with outstanding athletic facilities.”

MSU students approved of a fee of $50 per semester to help pay for the improvements. The fee will generate approximately $1.6 million annually. The university also gained financial support from Betty and Bobby Allison, for whom two new stadiums are named.

Athletic Field Improvements

PHOTOS COURTESY OF MISSOURI STATE UNIVERSITY

The improvements included relocating the school’s track and building a new artificial turf football field closer to the west bleachers to improve the fan experience. A new NCAAregulation, eight-lane track was also built as part of the new synthetic turf soccer field. The new track incudes steeplechase, long jump, triple jump, high jump, pole vault and a warm-up running area. Meanwhile, Byrne& Jones installed a shock pad to improve safety, play and the durability for a new field hockey
surface installed by SportsTurf.

To create a stable sub-base that sheds water efficiently, 15,000 tons of rock were imported and delivered in 750 truckloads for the three fields. “We essentially created a huge French drain that directed water flow efficiently into the storm water system,” said Ben Traetow, project manager, Byrne & Jones Sports.

Overall improvements included renovations to MSU’s Plaster Sports Complex to provide better seating and new concessions, restrooms, ticket windows and team facilities. Other improvements were made to the soccer stadium and recreational amenities on campus. Hastings + Chivetta Architects, Inc. was the architect for the improvements. Springfield-based general contractor DeWitt and Associates, Inc. managed the overall improvements.

This article originally appeared in the issue of .

Featured

  • Electrifying Bus Fleets

    Now is an excellent time for K-12 “yellow” school buses, college campus transportation, and public transit systems to transition to zero-emission electric buses instead of traditional gas or diesel-powered models.

  • Case Systems makerspace

    Case Systems Launches Line of K–12 Learning Spaces Installations

    Case Systems recently announced the launch of SALTO, a line of classroom fixtures and installations for K–12 learning spaces like STEM labs, art rooms, and makerspaces, according to a news release. The product line is designed to provide teachers with flexibility and adaptability, enabling them to shift between collaborative and individual learning environments.

  • Massachusetts Charter School Opens New Academic Building

    The Advanced Math and Science Academy Charter School (AMSA) in Marlborough, Mass., recently held a ribbon-cutting ceremony for a new academic building, according to a news release. The 17,000-square-foot space will serve as a classroom and science lab building for the student population of almost a thousand in grades 6–12.

  • zSpace Imagine Learning Solution

    zSpace Introduces Headset-Free AR/VR System

    Immersive learning company zSpace has debuted the zSpace Imagine Learning Solution, a headset-free AR/VR laptop system designed for elementary education. The all-in-one platform integrates hardware, software, and hands-on lessons to create dynamic learning experiences for young students.