ESCOS: Potential Funding Source for Sustainable Schools

“How can we pay for the energy efficiency improvements?” The answer is funding, which can come from a variety of sources — internal funds, bonding, debt financing, lease or lease-purchase agreements, energy performance contracts, utility incentives and government grants, to name a few. For many schools funding remains the roadblock to implementing energy efficient technologies, and internal funding is not an option.

Leasing or debt financing may provide a workable alternative. In both cases the high up-front costs can be reduced or avoided, and costs can be repaid through the savings that accrue. Another method is perfomance contracts provided by ESCO’s (Energy Service Companies). Typically the ESCO provides a service package that includes the design and engineering, financing, installation and maintenance of the retrofit. Most importantly, ESCO’s provide a guarantee of the energy savings. Schools should also take advantage of the incentives offered by utility companies for the installation of energy efficient equipment. These offers range from equipment rebates, to design assistance, to low-interest loans.

Along with the corporate world, many states have also stepped up to the plate when it comes to financing energy efficient schools. Some states are providing low-interest loans for conservation and renewable resource projects. Others provide state energy tax credits to eligible projects. Also, don’t overlook the many federal agencies offer grants or make financing available to schools for projects that affect energy efficiency. The money is available, the key is finding it.

The most important thing to remember is that being energy efficient does not necessarily translate into significant expenses. When designing new buildings the construction cost trade-offs often allow the architects to incorporate energy-efficient technologies without an increase in cost. When operating existing buildings insulate and weatherstrip, repair cracked windows, close outside doors behind you, plant trees or large shrubs to act as windbreaks or for shade, install low water-use fixture, automate building controls and turn off the lights!

This article originally appeared in the issue of .

Featured

  • Craig Gaulden Davis Architecture Announces Merger with PBK

    Craig Gaulden Davis Architecture (CGD), based in South Carolina and Maryland, recently announced that it has merged with PBK, the largest K–12 architectural firm in the U.S., according to a news release. The firm will operate as Craig Gaulden Davis | PBK with 31 offices across the country.

  • UTEP Celebrates Construction Milestone for New Academic Building

    The University of Texas at El Paso in El Paso, Texas, recently held a “topping out” ceremony for its new learning complex, Texas Western Hall, according to university news. The construction milestone marks the placement of the last beam of a structure in progress.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.