ESCOS: Potential Funding Source for Sustainable Schools

“How can we pay for the energy efficiency improvements?” The answer is funding, which can come from a variety of sources — internal funds, bonding, debt financing, lease or lease-purchase agreements, energy performance contracts, utility incentives and government grants, to name a few. For many schools funding remains the roadblock to implementing energy efficient technologies, and internal funding is not an option.

Leasing or debt financing may provide a workable alternative. In both cases the high up-front costs can be reduced or avoided, and costs can be repaid through the savings that accrue. Another method is perfomance contracts provided by ESCO’s (Energy Service Companies). Typically the ESCO provides a service package that includes the design and engineering, financing, installation and maintenance of the retrofit. Most importantly, ESCO’s provide a guarantee of the energy savings. Schools should also take advantage of the incentives offered by utility companies for the installation of energy efficient equipment. These offers range from equipment rebates, to design assistance, to low-interest loans.

Along with the corporate world, many states have also stepped up to the plate when it comes to financing energy efficient schools. Some states are providing low-interest loans for conservation and renewable resource projects. Others provide state energy tax credits to eligible projects. Also, don’t overlook the many federal agencies offer grants or make financing available to schools for projects that affect energy efficiency. The money is available, the key is finding it.

The most important thing to remember is that being energy efficient does not necessarily translate into significant expenses. When designing new buildings the construction cost trade-offs often allow the architects to incorporate energy-efficient technologies without an increase in cost. When operating existing buildings insulate and weatherstrip, repair cracked windows, close outside doors behind you, plant trees or large shrubs to act as windbreaks or for shade, install low water-use fixture, automate building controls and turn off the lights!

This article originally appeared in the issue of .

Featured

  • Virginia Tech Establishes New Facility for School of Construction

    Virginia Tech recently partnered with construction management firm Procon Consulting to establish the Procon Innovation Center on its campus in Blacksburg, Va., according to a news release. The facility inside the university’s newly built Hitt Hall will offer hands-on collaboration and learning opportunities for students in the Myers-Lawson School of Construction and College of Engineering.

  • Los Angeles Unified School District Adopts VR Learning Platform

    The Los Angeles Unified School District (LAUSD) recently announced its partnership with Avantis Education to bring educational virtual and augmented reality (VR/AR) solution ClassVR to its students. A news release reports that the district has already deployed more than 16,000 ClassVR headsets as part of the Los Angeles Unified Instructional Technology Initiative.

  • New Elementary School Opens in South Bronx, N.Y.

    Forte Construction Corp. recently announced that it has completed construction on P.S. 487, a new four-story elementary school in the South Bronx, according to a news release. The school is open for the current academic year and will serve more than 500 students in grades PreK–5.

  • California District Completes Second Phase of Construction on Innovation Campus

    The Milpitas Unified School District (MUSD) in Milpitas, Calif., recently announced that Phase Two of construction is complete on the MUSD Innovation Campus, according to a news release. The district is partnering with Blach Construction and Quattrocchi Kwok Architects (QKA) on the education and workforce development center, which will support Calaveras Hills High School.

Digital Edition