What's in the Adobe Studio?

  • Adobe Digital StudioThe Studio introduces itself by cantilevering through a new 16- by 32-foot opening in the existing lobby’s east wall and is visible from the entrance below.
  • A stainless-steel-clad Help Desk varies from standing- to seating- to wheelchair-height to accommodate various seating configurations and interactions. Power and data ports allow ad hoc work teams to “plug in” anywhere — and include drains for spilled coffee.
  • A Video Production Studio includes a horizon-less green screen, which simplifies replacement of backgrounds in live video, and sound-absorptive wall panels to minimize sound flutter.
  • An Audio Production Studio houses audio recording and editing equipment.
  • Seating varies, from stools to chairs and modular “living room” groups to on-floor lounge chairs. All are portable.
  • Technical provisions allow collaborators to share live screen images from multiple computers within the group or on public screens within the Studio.
  • The “Behance Wall,” a cluster of wallmounted monitors — one of only three in the country and the only one outside of Adobe’s headquarters — streams projects based on criteria entered by touchscreen within the Studio.
  • Three-inch-high access flooring throughout allows access to and easy reconfiguration of data and power wiring as the future placement and technology evolves.

This article originally appeared in the issue of .

Featured

  • TCU Completes Construction on New Medical School Building

    Texas Christian University in Fort Worth, Texas, recently completed construction on a new home for the Anne Burnett Marion School of Medicine, according to a news release. Arnold Hall, standing four stories and covering 95,000 square feet, is the university’s first major off-campus development.

  • DIGroup Architecture to Design New STEM Building for N.J. PreK–12 School

    DIGroup Architecture recently announced that it has been selected to design a new Hall of Science & Entrepreneurship at Saddle River Day School, a PreK¬–12 school in Saddle River, N.J., according to a news release. The project is part of the larger, schoolwide “Building the Future Campaign,” and its purpose is to promote critical thinking, scientific exploration, and an entrepreneurial spirit within the learning environment.

  • California District Completes Second Phase of Construction on Innovation Campus

    The Milpitas Unified School District (MUSD) in Milpitas, Calif., recently announced that Phase Two of construction is complete on the MUSD Innovation Campus, according to a news release. The district is partnering with Blach Construction and Quattrocchi Kwok Architects (QKA) on the education and workforce development center, which will support Calaveras Hills High School.

  • Virginia District Breaks Ground on New Elementary School

    Prince William County Public Schools (PWCS) in Prince William County, Va., recently broke ground on Occoquan Elementary School, according to a news release. The new facility will become the district’s first net-zero school and replace its oldest facility. The school is scheduled to open for the fall 2026 semester.

Digital Edition