University of California, Santa Barbara: Davidson Library

University of California, Santa Barbara: Davidson Library interior and exterior images

PHOTOS © LERUM PHOTO

The $58.5 million renovation of the Davidson Library at University of California, Santa Barbara (UCSB) is designed to enhance teaching, learning and research at UCSB, meeting the needs of the campus’ growing student body. Constructed by C.W. Driver, various renovations including Fire and Life Safety upgrades and seismic retrofits were made in order to bring the existing library up to code while also incorporating a range of collaboration spaces, a café and numerous open-air study areas. C.W. Driver worked closely with the university and library staff throughout the entire project to lessen the impact of construction to students and staff, working around the university’s schedule.

Designed by Pfeiffer Partners, the renovations included the addition of a 62,000-square-foot, three-story building to the north of the library, which houses the Special Research Collections, a collection of rare artifacts and materials available to UCSB students, faculty and the scholarly community. Due to the historic contents, the space requires very tight humidity and temperature controls which are regulated by dedicated HVAC units and a large desiccant wheel dehumidifier. A cold room, designed to imitate a walk-in refrigerator, and a vault area were installed for the most sensitive and valuable items.

Davidson Library achieved LEED Gold certification and joins approximately 24 LEED-certified buildings already at UCSB. To achieve this distinction, C.W. Driver incorporated a number of aspects to optimize energy efficiency, improve indoor environmental quality and maximize the use and reuse of sustainable and local resources. Additionally, UCSB’s Davidson Library was one of the first Construction Manager at Risk (CMAR) projects — a delivery method where the construction manager is committed to delivering the project within a guaranteed maximum price — to be utilized within the University of California system.

Despite labor shortages in the region throughout the duration of the project, UCSB’s Davidson Library was completed on-budget, four months ahead of schedule.

This article originally appeared in the issue of .

Featured

  • Minneapolis Public Schools Continues Work on New Construction, Renovation Projects

    Minneapolis Public Schools in Minneapolis, Minn., is working with integrated construction management firm Kraus-Anderson on renovations to North High School that include a new Career & Technical Education (CTE) Center, according to a news release. The three major components of the project are new academic and athletic spaces, a new central student commons, and a North CTE Center.

  • Chef Ann Foundation Awards Grants to Purchase Bulk Milk to 15 K–12 Districts

    The Chef Ann Foundation recently announced that it has awarded 29 grants to 15 school districts around the U.S. to go toward purchasing milk in bulk instead of single-serve containers. The Bulk Milk program is in its second year and provides recipients with the equipment, training, and materials required for schools to make the shift, according to a news release.

  • Pick Everard Completes New Special Education School in England

    Multidisciplinary consultancy Pick Everard recently announced that construction is complete on a new specialist school for students with Social, Emotional, and Mental Health (SEMH) needs in Shepshed, Leicestershire, England, according to a news release. Bowman Academy will open in September 2024 and serve students ages 4–16.

  • Riverside Community College District Completes $29.3M Renovation Project

    Riverside City College recently announced the completion of a $29.3-million renovation project, according to a news release. The college partnered with Nineteen Six Architects and builder C.W. Driver Companies to convert a 1960s-era academic building into a new Business, Law, and Computer Information Systems Building.

Digital Edition