Rodents: How Are They Getting In, How Do We Stop Them?

It’s critical that pest problems be identified and addressed as quickly as possible because rodents breed quickly — a single pair of rats can multiply into 640 within a year, and mice can multiply to over 1,000. Stopping them for good means finding the points of entry and sealing them up to prevent future invasion. Below are some of the most common entry points and exclusion solutions. Remember, when conducting your inspection, mice can fit through a gap of about 1/4 inch and rats through a gap of 3/8 inch.

Common Entry Points and Solutions:

  • Exterior doors — Damaged or worn out sweeps are one of the most common entry points. Most standard brush or vinyl sweeps keep out the weather but not mice and rats. All doors should be fitted with specialized rodent-proof door sweeps.
  • Vents and grilles — Protect them with screen or mesh and ensuring any voids or gaps around them are filled with a pest exclusion material.
  • Drain pipes — Rats are excellent swimmers. Make sure exterior drain and sewer access points are covered with an appropriate metal cover. Openings surrounding the drain should be patched or filled.
  • Vertical wires and pipes — Mice and rats are excellent climbers. Circular rat guards should be placed around all vertical wires and pipes.
  • Utility and other building penetrations — Check places where pipes, wires or HVAC enter the building and fill any gaps with pest exclusion material.

Ensure the exterior of the building, especially around the foundation, is free from harborage areas such as shrubs and ground cover, and eliminate any “bridges” to the roof, like overhanging trees.

This article originally appeared in the issue of .

About the Author

Drew McFadden is director of Marketing for Xcluder, and can be reached at [email protected].

Featured

  • University of Kentucky Receives $2.5M Donation Toward Renovation Project

    The University of Kentucky in Lexington, Ky., recently announced that it has accepted a $2.5-million donation that will transform Pence Hall into the home of the university’s College of Communication and Information, according to a news release.

  • University of Florida to Start Construction on New Agricultural, Engineering Building

    The University of Florida in Gainesville, Fla., recently announced that it will soon begin construction on a new academic building for the department of agricultural and biological engineering (ABE), according to a news release. The W.W. Glenn Teaching Building is scheduled to begin construction by the end of 2024 and finish by August 2025, in time for the new academic year.

  • DIGroup Architecture to Design New STEM Building for N.J. PreK–12 School

    DIGroup Architecture recently announced that it has been selected to design a new Hall of Science & Entrepreneurship at Saddle River Day School, a PreK¬–12 school in Saddle River, N.J., according to a news release. The project is part of the larger, schoolwide “Building the Future Campaign,” and its purpose is to promote critical thinking, scientific exploration, and an entrepreneurial spirit within the learning environment.

  • Shaping Campus Identity: The Crucial Role of Landscape Architecture in Campus Design

    Landscape architecture plays a crucial role in shaping the overall experience, functionality, and identity of college and university campuses. The design and layout of outdoor spaces influence everything from the interactions between students to the ease with which people navigate the campus. A thoughtfully designed campus provides not only a functional environment for daily activities but also a space that inspires academic success and fosters personal growth.

Digital Edition