Building With Wood

Designing and building with wood provides a solution to some of the common challenges that come with education building projects—from tight timelines and limited budgets to stringent safety requirements and high standards for sustainability. Schools are placing a premium on organic materials, sustainability, and brighter, more flexible, open-layout interiors—all areas where wood construction thrives.

At the University of North Carolina at Greensboro, wood saved $15 per square foot on one student housing project, Spartan Village Phase I, compared to a metal and concrete alternative. Designed by Lord, Aeck Sargent, the 385,000-square-foot building provides 800 new student beds while creating a new neighborhood that sets the tone for future mixed-use developments.

Wood also offers several advantages where student housing is being added to existing neighborhoods. Multi-story wood structures meet residential code requirements and adhere to required safety and structural performance guidelines for urban infill buildings. Plus, infill real estate often carries a premium price, so the economic advantage gained by building multiple stories of wood over a podium-type structure may be the only way a project can work financially.

At the same time, educational institutions are increasingly using mixed-use projects to add vital businesses to surrounding neighborhoods. At the University of Washington, Mahlum Architects made the most of the urban Seattle location for a five-building project known as West Campus Student Housing – Phase 1, designing each building with five stories of wood-frame construction over a two-story concrete podium. Constructed for $177 per square foot, the award-winning development includes ground-floor amenities such as a grocery store, conference center, and fitness center.


Think Wood is an initiative of the Softwood Lumber Board that provides guidance to ensure safe, predictable, and economical use of softwood lumber in multi-family and non-residential building applications. To learn more, visit ThinkWood.com.

This article originally appeared in the College Planning & Management March 2018 issue of Spaces4Learning.

Featured

  • Minnesota High School Completes $226M Addition, Renovation Project

    White Bear Lake Area High School – North Campus in White Bear Lake, Minn., recently announced the completion of a $226-million renovation and addition project, according to a news release. The district partnered with Kraus-Anderson for the project’s construction, which involved creating a single high-school site for the White Bear Lake Area School District.

  • Designing a Performing Arts Center from a PE Perspective

    Designing a top-tier performing arts facility for a high school is a complex endeavor that demands a delicate balance between advanced technical specifications and practical budget considerations. Nevertheless, it represents a crucial initiative that enriches educational and community engagements.

  • Texas District Breaks Ground on New Elementary School

    The Splendora Independent School District (SISD) in Splendora, Texas, recently broke ground on a replacement facility for Greenleaf Elementary School, according to a news release. The district partnered with planning, engineering and program management firm Lockwood, Andrews & Newnam, Inc. (LAN) for the project.

  • Minnesota District Completes Major Renovations, Expansions to High School

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced that it has completed the renovation and expansion of White Bear Lake Area High School, according to a news release. The school’s final addition, a new 845-seat Performing Arts Center, was finished in November.