Boys and Girls Club of Lancaster

Project Snapshot

PROJECT: Gymnasium Acoustic Improvement
DISTRICT/INSTITUTION: Boys and Girls Club of Lancaster
LOCATION: Lancaster, Penn.
COMPANY NAME: Armstrong Ceiling & Wall Solutions
WEBSITE: www.armstrongceilings.com

Boys and Girls Club of Lancaster

Reverberation time in the Boys & Girls Club of Lancaster, Penn., was more than twice the recommended level, which puts a strain on staff who are trying to communicate with the children who use the facilities. To get that reverberation time below the recommended level, club officers decided to use Armstrong Ceiling’s TECTUM Direct-Attach wall panels on the gymnasiums walls. The recommended level is 2 seconds. The reverberation time in the gym is now 1.85 seconds.

THE CHALLENGE

The gymnasium at the Boys & Girls Club of Lancaster is in use every day, not only for sports activities but a variety of other functions as well. Its acoustic environment, however, was not always ideal. Acoustical testing showed that reverberation time in the gym was 5.05 seconds, far above the 2.00 seconds or less recommended for this type of space. As Karen Schloer, the Club’s Chief Executive Officer, notes, “The noise level was putting a real strain on the staff because they had to shout so often when trying to communicate with the kids.”

THE SOLUTION

To solve the problem, Armstrong Ceiling and Wall Solutions installed more than 3,500 square feet of TECTUM Direct-Attach wall panels on the gym’s masonry walls. The panels were chosen because of their ability to absorb both sound and the impact of basketballs, volleyballs, and other objects that hit the walls.

Aesthetically, the two-inch-thick, 2-foot by 4-foot panels are installed in ribbons of white and a custom blue that match the Club’s colors. They start nearly 10 feet off the floor and continue up the wall another 18 feet.

Boys and Girls Club of LancasterIn addition, a re-creation of the Boys & Girls Club logo is installed at each end of the gym. The 15-feet-wide and 13 feet high visual of two interlocking hands was created using 8-inch triangular TECTUM Panel Art shapes. The white triangles are one inch thick, while the blue triangles are two inches thick so that they stand out from the wall. Two rows of 12 SOUNDSOAK Baffles were installed in the center of the ceiling for added noise absorption.

Acoustically, the 2-inch Direct-Attach TECTUM wall panels have a Noise Reduction Coefficient (NRC) of 0.70. Acoustical testing conducted after the installation of the combination acoustical treatment showed that reverberation time dropped to 1.85 seconds, a 63-percent reduction.

IMPACT ON LEARNING

According to Chief Operations Officer, Scott McLellan, the difference is “like night and day. The biggest takeaway is how much easier it is now for the staff to gain control of the space because the kids can hear directions much more clearly.

Looking back at the difference in the gym’s acoustic comfort, McLellan adds, “The staff simply didn’t realize how bad it was because they didn’t realize how good it could be.”

Editor’s Review

The study, “Effects of Classroom Acoustics on Performance and Well-Being in Elementary School Children: A Field Study”, conducted by the University of Kaiserslautern, in Germany, found that children in a school are more prone to being negatively impacted by acoustical impairments like reverberation and echo. In the Boys and Girls Club’s gymnasium, testing showed that reverberation time was way above the recommended amount. The new Armstrong Ceiling panels helped cut down on this time, allowing children to hear better, and staff to communicate more easily in the space, maximizing the experience for everyone, and adding acoustical comfort.

This article originally appeared in the School Planning & Management March 2018 issue of Spaces4Learning.

Featured

  • a traditional red brick school building with the right side visibly deteriorated and the left side well-maintained, surrounded by neat landscaping

    Making the Grade: Navigating Funding Uncertainty in K-12 Schools

    School districts across the country must prepare for all possible funding scenarios by analyzing school asset and infrastructure conditions, understanding their funding needs, and developing a proactive maintenance strategy to stretch their funding dollars.

  • Tennessee District Opens New Central Office

    The Franklin Special District (FSD) in Franklin, Tenn., recently held a ribbon-cutting ceremony for its new 38,400-square-foot Central Office facility, according to a news release. The district partnered with Wold Architects and Engineers to create an administrative space designed to boost productivity, collaboration, and employee wellness.

  • PNSI Global Alliance Launches New Quality Assurance Certification

    PNSI Global Alliance, a network of technology integrators and service providers, recently introduced a new Quality Assurance Certification (QAC) for AV service and support, according to a press release. The two-day, interactive workshop QAC course is designed for Certified Solution Providers (CSPs) to provide them with the most up-to-date and advanced quality assurance knowledge available.

  • Illinois Elementary School Breaks Ground on Campus Expansion

    Heather Hill Elementary School, part of Flossmoor School District 161 in Palatine, Ill., recently broke ground on a new addition to the school focused on student support and security, according to a news release. The district partnered with Wold Architects & Engineers for the expansion as part of a longer-term facility planning and modernization initiative.