UCLA Reduces Energy Use

audacy wireless

UCLA has achieved a 35 percent savings in their overall electrical lighting load after retofitting Audacy’s lighting control devices into existing infrastructure.

As one of the world's leading universities, the University of California, Los Angeles (UCLA) is committed to environmental responsibility and sustainability. Part of that commitment is ensuring that all energy is used wisely.

Kevin Borg is UCLA’s assistant athletic director for facilities and project management. He is charged with driving maximum performance from each facility across the school’s intercollegiate programs. Borg also is accountable for stewarding the budget needed to build and run each facility in an increasingly demanding economic and regulatory environment.

California’s tough new Title 24 regulations demand that organizations with largescale buildings, campuses, and facilities networks prove they are reducing energy usage across their operations each year. The Energy Information Administration reports that lighting can be up to 40 percent of an organization’s energy bill each year—a statistic that rings true with Borg.

After easily retrofitting Audacy’s wireless devices into existing light fixtures and infrastructure, UCLA used simple occupancy/vacancy, task tuning, and dimming approaches to achieve a 35 percent savings in their overall electrical lighting load. The Audacy system provides the UCLA facilities managers the ability to manage, monitor, and adjust their organization’s lighting system from a laptop, tablet, or smartphone from anywhere in the world.

Over the 12-month test period, Borg and his team consistently delivered at least a 35 percent reduction in total energy usage “just by delivering the right amount of light to the right room at the right time.” Borg explains, “The most efficient light is one that is off. So, we’re now set up to automatically program lights to turn off when a room isn’t being used.”

“It’s a game-changer,” says Borg. “The Audacy system allows us to optimize both our lighting and energy usage from building to building. It’s simple. Intuitive. Effective.”

www.audacywireless.com

This article originally appeared in the College Planning & Management April/May 2019 issue of Spaces4Learning.

Featured

  • Massachusetts Charter School Opens New Academic Building

    The Advanced Math and Science Academy Charter School (AMSA) in Marlborough, Mass., recently held a ribbon-cutting ceremony for a new academic building, according to a news release. The 17,000-square-foot space will serve as a classroom and science lab building for the student population of almost a thousand in grades 6–12.

  • Fort Collins to Convert 1980s Office Park into Junior High School

    The Liberty Common School, a charter-public school in Fort Collins, Colo., recently broke ground on an adaptive reuse project that will convert an 1980s-era office park into a 45,000-square-foot junior high school for seventh- and eighth-grade students, according to a news release.

  • Illinois Elementary School Breaks Ground on Campus Expansion

    Heather Hill Elementary School, part of Flossmoor School District 161 in Palatine, Ill., recently broke ground on a new addition to the school focused on student support and security, according to a news release. The district partnered with Wold Architects & Engineers for the expansion as part of a longer-term facility planning and modernization initiative.

  • College of the Desert Starts Construction on New Campus Location

    College of the Desert recently announced that it has broken ground on its new Palm Springs campus in Palm Springs, Calif., according to a news release. The multiple-building campus consists of 175,000 square feet of new construction and will cost an estimated $268 million.