UMass Reduces Heat Loss, Earns LEED Gold

schock

UMass Amherst reduced heat loss through steel canopy beams by half at its LEED Gold-certified Life Science L

The five-story 310,000-square-foot Life Science Laboratories building at UMass Amherst is designed to foster collaboration among faculty and student researchers. Also designed to qualify for LEED Gold certification, it employs a range of advanced measures to slash energy usage, carbon emissions, and related costs.

Sustainability is especially challenging for a research facility, which typically consumes more energy than comparable buildings.

To meet safety and functional requirements of the building while minimizing energy use, Wilson Architects and Lim Consultants specified low-flow fume hoods and plumbing fixtures, energy-recovering air handling units and heat recovery chillers, water reclamation and recycling systems, sensor-controlled lighting and water-cooled systems, while maximizing the effect of sunlight.

An additional energy-saving strategy was required to mitigate the potential of thermal bridging through steel beams that penetrated the insulated building envelope to support a 300-foot glass canopy spanning the length of the building’s façade.

However, exterior steel cantilevers supported by interior structural steel would cause interior heat to be conducted through the cantilevers and dissipated into the environment, requiring steel-to-steel insulation in the form of structural thermal breaks, or “STBs.”

The canopy support structure consists of 40 steel beams spaced approximately 10 feet apart. Wilson Architects specified an Isokorb® Type S22 STB supplied by Schöck North America to be positioned where the cantilevers penetrate the insulated building envelope, reducing heat loss by approximately 50 percent at each penetration.

With the energy-saving technologies in place, including structural thermal breaks for the canopy support structure, the lab saves approximately $300,000 in energy costs per year.

www.schock-na.com

This article originally appeared in the College Planning & Management April/May 2019 issue of Spaces4Learning.

Featured

  • Minnesota High School Completes $226M Addition, Renovation Project

    White Bear Lake Area High School – North Campus in White Bear Lake, Minn., recently announced the completion of a $226-million renovation and addition project, according to a news release. The district partnered with Kraus-Anderson for the project’s construction, which involved creating a single high-school site for the White Bear Lake Area School District.

  • Designing a Performing Arts Center from a PE Perspective

    Designing a top-tier performing arts facility for a high school is a complex endeavor that demands a delicate balance between advanced technical specifications and practical budget considerations. Nevertheless, it represents a crucial initiative that enriches educational and community engagements.

  • Texas District Breaks Ground on New Elementary School

    The Splendora Independent School District (SISD) in Splendora, Texas, recently broke ground on a replacement facility for Greenleaf Elementary School, according to a news release. The district partnered with planning, engineering and program management firm Lockwood, Andrews & Newnam, Inc. (LAN) for the project.

  • Minnesota District Completes Major Renovations, Expansions to High School

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced that it has completed the renovation and expansion of White Bear Lake Area High School, according to a news release. The school’s final addition, a new 845-seat Performing Arts Center, was finished in November.