Choice Career High School

WRA Architects

Project of Distinction 2019 Education Design Showcase

Choice Career High School

Project Information

Facility Use: High School
Project Type: New Construction
Category: Classrooms/Academic Buildings
Location: Mesquite, TX
District/Inst.: Mesquite ISD
Chief Administrator: Dr. David Vroonland
Completion Date: Fall 2021
Gross Area: 250,000 sq. ft.
Area Per Student: 125 sq. ft.
Site Size: 44 acres
Current Enrollment: 0
Capacity: 2,000
Cost per Student: $34,750
Cost per Sq. Ft.: $278
Total Cost: $69,500,000

Mesquite ISD’s Choice Career High School is the centerpiece of the district’s plan to address the growing population of students in its existing five high schools. This new campus will offer a unique option for a career- focused education to high school students from across the district and will serve as the home campus for those students who choose this path. The 250,000-square-foot campus will feature four schools with multiple programs within each: School of Technology, School of Engineering, School of Construction Science, and School of Health Sciences.

Choice Career High School Choice Career High School

The charge was to relieve the population growth at the five current high schools with the formation of a new Career & Technical Education (CTE) high school. District administration requested that the school must be designed for a maximum enrollment of 2,000 students in grades 9 through 12. The school is scheduled to open for the Fall semester of 2021.

During the programming, planning, and design, phases, the WRA team hosted a Design Charrette process with the CTE Committee, District staff, community members, and parents. The process put people into teams with boards and cut-out shapes representing various spaces in the building. The groups were asked to lay out an arrangement for their “dream career school” based on the curriculum, spaces, and elements that they thought were important. Each group presented their ideas to the larger group, with a vote at the end using sticker dots. The charrette helps WRA truly listen to users and fully understand their input.

Dr. David Vroonland, Mesquite ISD superintendent of schools, participated heavily in the design process saying, “This is a really exciting time for Mesquite ISD. We’re going down a road, an adventure if you will, in this new design that very few have gone down. I’m so excited for our children, in terms of the opportunity that they are going to be presented in just a few short years. I’m excited for what this school means for our community, because I really think it will drive economic opportunities as students begin graduating.”

Choice Career High School Choice Career High School

Dr. Vroonland went on to say, “I’m excited about the collaboration that is going to occur between our community and our high school in ways that it isn’t occurring now – that I think is going to be born out of this effort. And I’m really excited about what it’s going to look like. I think it’s going to be a high-profile building for our community and something that will make us proud, not only tomorrow, but way down in the future as well.”

After deciding on a conceptual configuration through the design charrette process with district and committee members, WRA recommended the following design goals, which were approved by the district and used to develop design concepts for the new school.

  1. Respect Mesquite ISD’s budget
  2. Functional success (Satisfy the Program)
  3. Respect the unique topography of the site and the context of the immediate surroundings
  4. Security (both exterior and interior)
  5. Aesthetic similar to a higher education campus without compromising functionality
  6. Daylighting (especially in the classrooms), views, sustainability
  7. Thoughtful consideration of the users’ experience of the building
  8. Plan layout centered around the teaching of career-specific skills in project-based learning environments

Choice Career High SchoolWRA’s unwritten goals, which are appropriate to mention here, are to create an environment conducive to learning and teaching. Designing a building to sustain long term value and energy efficiency spearheaded the major goals used in designing the aesthetic and functional layout of the building. Furthermore, WRA always designs with the goals of long and short-term value, budget consciousness, educational appropriateness, durability, and energy efficiency.

Judges Comments

Nice concepts. Good use of volume in common spaces. Impressive design charrette process. Good overarching goals. Should resubmit when construction is complete.

Architect(s):

Choice Career High SchoolWRA Architects
GRAHAM BAUMANN, AIA
214/750-0077

Featured

  • Tennessee District Opens New Central Office

    The Franklin Special District (FSD) in Franklin, Tenn., recently held a ribbon-cutting ceremony for its new 38,400-square-foot Central Office facility, according to a news release. The district partnered with Wold Architects and Engineers to create an administrative space designed to boost productivity, collaboration, and employee wellness.

  • Norfolk State University Partners with Voltus for Energy Efficiency Program

    Norfolk State University recently announced that it has selected Voltus, Inc., to implement the university’s new energy efficiency program on its campus in Norfolk, Va. According to a news release, the partnership’s goal is to reduce campus energy use by 27% by the year 2030 and support grid reliability across the state of Virginia.

  • Zurn Elkay Announces Updated Line of Filtered Bottle Filling Stations

    Zurn Elkay Water Solutions recently released an updated line of its Elkay Filtered Bottle Filling Stations, according to a news release. The new line features a sleeker design and functional upgrades to help simplify filter maintenance and reduce long-term labor costs.

  • Quadient Achieves 25,000 Locker Installations Worldwide

    Global automation platform Quadient recently announced that it has acquired Package Concierge, a U.S.-based parcel management solutions provider, according to a news release. The acquisition pushes Quadient over the 25,000-unit milestone of global installations.