New Missouri Elementary Features Collaborative Spaces for Each Grade Level

Renderings and floor plans of a new elementary school were shared in the last Washington School District board meeting. The new, two-story elementary school will replace South Point Elementary and is funded by Prop S, a $26 million bond issue approved in April.

Bond Architects and Washington Engineering gave a presentation to board members on the project. The 78,000-square-foot building will be “angular with both rustic and industrial flair inside and out featuring a dynamic color scheme,” Superintendent Dr. Lori VanLeer, told a local newspaper. The school will feature collaborative spaces for each grade level with books available to check out in each space in addition to a library/makerspace with space for full class instruction and room to build projects.

Classrooms for kindergarten through second grade will be on the first floor with third through sixth grade on the second level. The gym, located on the main floor in the center of the building, will also be a storm shelter with adjacent bathrooms and a backup generator.

Construction bids will go out in early January and a contract will be awarded in late January or early February with construction beginning in the spring of 2020.

The new school is estimated to cost $23 to $24 million and slated to open in August 2021.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Purdue University

    Purdue Celebrates Grand Opening of Large Esports Facility

    Purdue University has officially opened a new gaming lounge for students training and competing in esports as well as casual gamers. The institution partnered with Dell Technologies to outfit the 2,000-square-foot-space with Alienware gaming equipment.

  • LocknCharge Launches App-Based Smart Locker System

    LocknCharge, a developer of mobile phone charging, storing, security, and technology management solutions, recently launched the new FUYL Enhanced Smart Locker System, according to a news release. The app-based kiosk allows self-serve access to devices while also providing full security and control.

  • Colorado State University Starts Construction on Liberal Arts Building Renovation

    Colorado State University in Fort Collins, Colo., recently began construction on a $137-million renovation project to one of its largest academic buildings, according to local news. Last week, one of the three wings of Clark Hall (“Clark B”) was demolished to clear the way for a ground-up replacement.

  • University of Wisconsin-Milwaukee Debuts New Chemistry Building

    The University of Wisconsin-Milwaukee in Milwaukee, Wis., recently celebrated the grand opening of a new Chemistry Building, according to a news release. The facility measures in at 163,400 square feet, stands four stories, and has the capacity for about 5,000 chemistry and biochemistry students.

Digital Edition