Schools In Focus: Food Service During a Pandemic

Schools In Focus is a Spaces4Learning podcast dedicated to K-12 and higher ed design, planning, and management. Each episode will feature a conversation with industry experts, facility managers, architects, and thought leaders on topics related to educational facilities. Catch up on previous episodes here.

Today's episode is about K-12 food service during a pandemic.

Schools In Focus, Episode 6: School Lunch During a Pandemic

Schools In Focus podcast logo and Belinda Oakley, CEO of Chartwells K12, and Seth Ferriell, CEO of SSC Services for Education. 

Lunchtime is a bright spot in anyone’s day, especially for students. It’s a time for them to socialize and fuel up for the rest of their day. However during a pandemic, school lunch looks totally different. In this episode of Schools In Focus podcast, I speak to Belinda Oakley, CEO of Chartwells K12, and Seth Ferriell, CEO of SSC Services for Education, about school food service during a pandemic.

“There’s a number of ways to make sure school lunch is still a bright spot in a student’s day in this new environment but it’s really about having a flexible view of that and being prepared to pivot and change your plan as the situations continue to evolve,” Oakley says in the podcast.

We discuss various models of food service to accommodate social distancing such as lunch in classrooms and take-home meal kits; keeping cafeterias and classrooms clean; sustainable options to combat the increase of paper and plastic; and innovation in the K-12 food service industry.

Where to Listen

Schools In Focus is available on Apple Podcasts, Google Play, and Stitcher. Subscribe today, or listen below!

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Florida District Selects Designer for K–8 Prototype Campus

    St. Lucie Public Schools in St. Lucie, Fla., recently announced that it has selected Spiezle Architectural Group, Inc., to design its new Western Grove K–8 prototype campus, according to a news release. Construction on the 217,500-square-foot facility will begin in February 2025 and is scheduled for completion in August 2026.

  • Minnesota K–12 District Completes New Elementary School

    Rock Ridge Public Schools in Virginia, Minn., recently announced that construction of the district’s newest elementary school is complete. North Star Elementary cost $28.5 million and has the capacity for 600 students in grades 3–6, according to a news release.

  • college student sitting at a desk, studying on a glowing laptop with geometric shapes representing technology in the background

    Pearson Introduces New AI-Powered Study Tools

    Digital learning company Pearson has launched several new AI-powered tools to help provide students personalized help from within their e-textbooks or study platforms.

  • San Diego High School Hits Construction Milestone

    Part of a whole-site modernization project at Mira Mesa High School in San Diego, Calif., recently reached a construction milestone. The final steel beam of the new classroom and student services facility was put into place, completing the building’s structural framework.

Digital Edition