Energy Harness Releases Ceiling-Mounted UV-C Light Fixture

LED manufacturing and distribution solutions provider Energy Harness recently released a new product to help schools combat COVID-19. The Active Airflow UV-C fixture is a “germicidal” light fixture that sucks in air and treats it with ultraviolet light, providing an enclosed space with continuous disinfection from the virus as well as other airborne bacteria and germs.

The enclosed device can be installed in ceiling grids to treat indoor areas of up to 256 square feet. It can connect to the ceiling’s existing power grid used to power light fixtures. Multiple units can be installed in larger rooms to offer the same treatment. The unit does not produce visible light.

Energy Harness Active Airflow

Nationally recognized testing lab Intertek Laboratories found that the Active Airflow UV-C has a 99.9% effectiveness rate in eliminating pathogens from the air. Testing on the SARS-CoV-2 virus revealed that the device has a 99.998% inactivation rate for that virus in particular within a single second.

“We have demonstrated and studies have shown the effectiveness of UV-C light in killing the COVID-2 family of pathogens,” said the managing director of Energy Harness’ Midwest division, Patricio M. Daneri. “Our Active Airflow unit provides the added advantage of safe usage during the school day in occupied classrooms. The unit has a fan system to draw in the air, where it is cleaned and then cycled back into the room.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • College of the Desert Starts Construction on New Campus Location

    College of the Desert recently announced that it has broken ground on its new Palm Springs campus in Palm Springs, Calif., according to a news release. The multiple-building campus consists of 175,000 square feet of new construction and will cost an estimated $268 million.

  • Florida State University Selects Architect for Lacrosse Stadium

    Florida State University in Tallahassee, Fla., recently announced that it has selected PBK Architects as the designer for its new lacrosse stadium, according to a university news release. The university’s women’s lacrosse team will play its inaugural season in spring 2026 along with the stadium’s completion.

  • Craig Gaulden Davis Architecture Announces Merger with PBK

    Craig Gaulden Davis Architecture (CGD), based in South Carolina and Maryland, recently announced that it has merged with PBK, the largest K–12 architectural firm in the U.S., according to a news release. The firm will operate as Craig Gaulden Davis | PBK with 31 offices across the country.

  • North Dakota State University Starts Construction on Research Lab

    North Dakota State University in Fargo, N.D., recently began construction on the new, $78-million Bolley Agricultural Research Laboratory, according to a news release. The university partnered with JLG Architects and Clark & Enersen for the building’s design and with Kraus-Anderson for its construction.