HVAC Flaw Might Have Led to Pa. Elementary School COVID Outbreak

Late last month, eight second-grade students from a single classroom at Penn Valley Elementary School in the Lower Merion School District near Philadelphia, Pa., tested positive for coronavirus. Officials are calling it the first instance of significant in-school transmission in the district. Because of the number of students affected, staff conducted an investigation and discovered a potential cause for the spread.

The LMSD Operations Department assessed the HVAC system of the classroom in question and found that a portion of the ductwork in the ceiling “was far too closed, allowing only (approximately) 30% of the maximum amount of fresh air it should have into this specific room,” said Terry Quinlan, the district’s lead supervisor of school health and student safety. Quinlan added that, with the current information, the district “cannot say definitively whether the diminished fresh airflow contributed to the outbreak; however, it could be a factor.”

The Montgomery County Office of Public Health (MCOPH) noted that the spread could also be due in part to a variant strain of COVID-19, “citing both the rapid spread within the class and the fact that two vaccinated family members of impacted students have also tested positive,” according to the district website.

All members of the second-grade class in question have been in quarantine since April 16. The district is in the process of performing indoor air quality tests at all buildings.

Lower Marion School District spokesperson Amy Buckman had no comment on improper social distancing might have contributed to the spread. However, she said that classrooms across the district are spacing students at least three feet apart in accordance with U.S. Centers for Disease Control and Prevention (CDC) guidelines, and that “this is the only outbreak impacting this number of students that we’ve seen.”

Quinlan said that district ventilation systems exceeded all standards prior to the pandemic and had been upgraded since then. MERV 13 filters have been installed throughout the district, as well as bipolar ionization devices in larger spaces.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • Florida Elementary School to Undergo $47M Reconstruction

    The School District of Osceola County in Kissimmee, Fla., recently announced a partnership with construction firm Skanska to reconstruct Reedy Creek Elementary School, according to a news release. The $47-million project will involve the new construction of a 96,000-square-foot academic center, renovating the remaining facilities, a full-site redevelopment, and demolishing portions of the existing school.

  • Oregon Institute of Technology to Construct $35M Mass Timber Residence Hall

    Oregon Institute of Technology in Klamath Falls, Ore., recently announced the construction of a new, $35-million mass timber residence hall, according to college news. The facility will stand four stories, have room for 517 students, and cover 86,710 square feet to address the college’s need for more on-campus housing.

  • UTEP Celebrates Construction Milestone for New Academic Building

    The University of Texas at El Paso in El Paso, Texas, recently held a “topping out” ceremony for its new learning complex, Texas Western Hall, according to university news. The construction milestone marks the placement of the last beam of a structure in progress.

  • Massachusetts Charter School Opens New Academic Building

    The Advanced Math and Science Academy Charter School (AMSA) in Marlborough, Mass., recently held a ribbon-cutting ceremony for a new academic building, according to a news release. The 17,000-square-foot space will serve as a classroom and science lab building for the student population of almost a thousand in grades 6–12.