Voltek Featured on “The Build Show” Video Series

Low voltage power solutions company Voltek Systems Inc. was featured in a recent episode of the popular home remodeling YouTube series "The Build Show." Host Matt Risinger, a contractor who specializes in architect-driven and fine craftmanship work, discussed the installation of low-voltage wired and powered USB outlets that can power devices like smartphones and laptops without the use of a bulky charging brick. The outlets provide input ports for both USB-A and USB-C cables.

A centrally mounted Voltek Rack Mount Power Supply unit converts 110-volt power into DC, which is distributed up to 1,000 feet through a low voltage cable to each outlet. One unit can provide power for up to 12 USB outlets installed throughout a facility. Outlets wired to the central rack mount can be placed anywhere in a building for easy charging capabilities without excess equipment. The rack-mounted power supply unit can also be attached to a battery backup to run for hours in the event of a power outage.

Wall-mounted USB outlets have grown in popularity in spaces like huddle areas, classrooms, study rooms, residence halls, and offices, as they offer the ability to charge a device conveniently and discreetly.

Voltek’s primary focus has been on the K–12 and Higher Education spaces, where laptops have become the norm for the teaching environment.  Nearly every model of laptop now charges over a USB-C connection, and the Voltek system provides the ability to charge these without the need for the AC-to-DC conversion brick. Voltek also aims to keep the laptop charging while the device is in use, as opposed to the student having to dock it on a charge cart and remove it from the learning environment during the interim.

Installation of Voltek outlets doesn’t require a licensed electrician, and they can easily be deployed as a retrofit in learning environments lacking electrical outlets. Additionally, they offer a significant cost savings over traditional 110 AC outlets when installed in a new construction project. Providing only low voltage power at the outlet, they are also safer due to no risk of electrical shock.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • VLK Architects Receives Caudill Award for Texas Learning Center

    VLK Architects recently received the Caudill Award for its work on the Dr. Jim F. Chadwell Administration Building and Discovery Lab Learning Center for Eagle Mountain-Saginaw ISD in Fort Worth, Texas, according to a news release. The award is the highest honor from the Texas Association of School Administrators (TASA) / Texas Association of School Boards (TASB) Exhibit of School Architecture yearly competition.

  • Fellowes Launches New Textile Collection

    Fellowes Contract Interiors recently partnered with Momentum Textiles & Wallcoverings to launch a new line of high-end-design, cost-effective textiles, according to a news release. Part of Momentum Textiles’ Kickstart collection, the new selection offers high-quality and versatile textiles for both smaller budgets and the early design phase of larger projects.

  • IFMA Appoints New President & CEO

    The International Facility Management Association (IFMA), based in Houston, Texas, recently announced its appointment of Michael Geary, CAE, as its new President & CEO, according to a news release. Geary’s previous role was as CEO of the Society for Marketing Professional Services (SMPS) and the SMPS Foundation.

  • Massachusetts Charter School Opens New Academic Building

    The Advanced Math and Science Academy Charter School (AMSA) in Marlborough, Mass., recently held a ribbon-cutting ceremony for a new academic building, according to a news release. The 17,000-square-foot space will serve as a classroom and science lab building for the student population of almost a thousand in grades 6–12.