Pennsylvania High School to Undergo $17.4M Traffic Flow Upgrade

Hampton High School, located near Pittsburgh, Pa., will see a major redesign of its parking lots and surrounding access roads later this year. The goal of the construction project is to improve and streamline the flow of traffic for the safety of students, faculty, and the surrounding community.

The renovations have been in the works for several years, according to Superintendent Michael Loughead. Specific tasks include reconfiguring the school’s parking areas, adding a second entrance off of nearby Topnick Drive, two building additions, and upgrades to lighting and landscaping. The total cost of the project is estimated at $17.4 million.

“The bus, car and pedestrian traffic will be separated, and student dropoff will occur at a safe location,” said Chris Brown, senior architect with VEBH Architects. “Vehicle circulation will be clearer than the current arrangement, and the areas of failing paving and sidewalks will be replaced.”

The project is slated to take about 18 months and will be done in phases to minimize disruptions to campus proceedings. Construction on the building addition, which will house an upgraded media center, will begin by the end of the summer. Another new facility includes a 2,400-square-foot storage garage measuring 40 by 60 feet that will house lawn and maintenance equipment.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Hartwick College Debuts Baking Innovation Lab

    Hartwick College in Oneonta, N.Y., recently debuted its new Baking Innovation Lab (BIL), part of the Hartwick Center for Craft Food and Beverage, according to a news release. The 3,500-square-foot facility serves as a lab for innovation, collaboration, and experimentation within the food and grain sector.

  • DLR Group Hires New Higher Education Business Development Leader

    Integrated design firm DLR Group recently announced that it has named a new Higher Education Business Development Leader who will serve out of the firm’s New York studio, according to a news release.

  • University of Kentucky Receives $2.5M Donation Toward Renovation Project

    The University of Kentucky in Lexington, Ky., recently announced that it has accepted a $2.5-million donation that will transform Pence Hall into the home of the university’s College of Communication and Information, according to a news release.

  • All Surfaces Announces New Director of Commercial Business Development

    Surface solutions provider All Surfaces recently announced that it has hired a new Director of Commercial Business Development in Torie Bonafede. Bonafede will work to build the company’s market presence in various categories and drive strategic initiatives to expand its commercial sales portfolio.

Digital Edition