Central State University Breaks Ground on Honors Dorm

On the campus of Central State University in Wilberforce, Ohio, officials recently broke ground on a new residence hall for students enrolled in the university’s Honors College. Construction on the $15-million facility is set to begin this month, be completed by July 2022 and open to students in time for the fall 2022 semester, according to local news.

The facility will cover 57,000 square feet of currently undeveloped space between the university’s library and the National Afro-American Museum & Cultural Center. The three-story facility will feature 119 beds, as well as amenities like multipurpose space, common areas, interactive study areas, and a lounge/dining area.

The CSU Honors College opened less than a year ago and has a current enrollment of a little more than 200 students. “Valedictorians, salutatorians, merit finalists…these individuals will be those high-achieving students, and this residence hall will hold many of those students,” said Dr. Jack Thomas, CSU President.

The facility was developed by national campus housing company University Housing Solutions. “This is going to be apartment-style housing—mostly two-bedroom units, but we do have one-bedroom studios, as well,” said Meghan Schmidt, the development director for University Housing Solutions.

Ohio Governor Mike DeWine attended the groundbreaking ceremony on Friday, Aug. 6. “It’s always great to meet students and hear what their vision is and what they want to do,” he said.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Florida District Selects Designer for K–8 Prototype Campus

    St. Lucie Public Schools in St. Lucie, Fla., recently announced that it has selected Spiezle Architectural Group, Inc., to design its new Western Grove K–8 prototype campus, according to a news release. Construction on the 217,500-square-foot facility will begin in February 2025 and is scheduled for completion in August 2026.

  • Minnesota K–12 District Completes New Elementary School

    Rock Ridge Public Schools in Virginia, Minn., recently announced that construction of the district’s newest elementary school is complete. North Star Elementary cost $28.5 million and has the capacity for 600 students in grades 3–6, according to a news release.

  • college student sitting at a desk, studying on a glowing laptop with geometric shapes representing technology in the background

    Pearson Introduces New AI-Powered Study Tools

    Digital learning company Pearson has launched several new AI-powered tools to help provide students personalized help from within their e-textbooks or study platforms.

  • San Diego High School Hits Construction Milestone

    Part of a whole-site modernization project at Mira Mesa High School in San Diego, Calif., recently reached a construction milestone. The final steel beam of the new classroom and student services facility was put into place, completing the building’s structural framework.

Digital Edition