Columbine High School Debuts Renovations

Columbine High School, located in Littleton, Colo., held a ribbon-cutting ceremony recently for a series of renovations to the campus, including a new entrance. A new outdoor awning provides more privacy than the previous entrance. The campus improvements come just two years after serious consideration was given to the facility’s demolition.

“The school is a model and symbol of resiliency,” said Columbine High School Principal Scott Christy. “It’s a model of what happens when people come together in the face of tragedy and become stronger as a result.” This addition, I think, just shows the strength of this community and this school.”

According to the school’s website, improvements include:

  • Exterior improvements including fresh paint and repairs
  • A new Auxiliary Gym featuring a dance studio
  • Remodels to the interior, including updated weight rooms and locker rooms
  • A new science lab, English classroom, Family and Consumer Science classroom, and a kitchen lab
  • Exterior and interior security improvements
  • Landscaping and athletic field improvements, including new turf and an all-weather track
  • Interior improvements including painting; updating wall coverings; replacing flooring, old furniture, sinks, cabinets and shelves; and replacing ceilings
  • Infrastructure updates including wiring, HVAC, plumbing and pipes, and replacing interior lights with LEDs

According to local news, the high school’s last major renovation was in 1995. The improvements were funded through a district-wide bond.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Florida District Selects Designer for K–8 Prototype Campus

    St. Lucie Public Schools in St. Lucie, Fla., recently announced that it has selected Spiezle Architectural Group, Inc., to design its new Western Grove K–8 prototype campus, according to a news release. Construction on the 217,500-square-foot facility will begin in February 2025 and is scheduled for completion in August 2026.

  • Minnesota K–12 District Completes New Elementary School

    Rock Ridge Public Schools in Virginia, Minn., recently announced that construction of the district’s newest elementary school is complete. North Star Elementary cost $28.5 million and has the capacity for 600 students in grades 3–6, according to a news release.

  • college student sitting at a desk, studying on a glowing laptop with geometric shapes representing technology in the background

    Pearson Introduces New AI-Powered Study Tools

    Digital learning company Pearson has launched several new AI-powered tools to help provide students personalized help from within their e-textbooks or study platforms.

  • San Diego High School Hits Construction Milestone

    Part of a whole-site modernization project at Mira Mesa High School in San Diego, Calif., recently reached a construction milestone. The final steel beam of the new classroom and student services facility was put into place, completing the building’s structural framework.

Digital Edition