HMFH Architects Unveils Design for Boston High-Rise Public School

The city of Boston, Mass., will soon be getting a new public school. HMFH Architects announced this week that it is putting finishing touches on the design for Josiah Quincy Upper School (JQUS), which will stand in a one-acre lot in the city’s “dense and diverse Chinatown neighborhood,” according to a news release. Construction is scheduled to begin in September and be finished in time for the 2024–25 academic year.

The school will serve 650 students in grades 6–12. JQUS will cover 178,000 square feet and feature amenities like rooftop outdoor classrooms; learning spaces for music, art and science; a student-grown garden; athletic and fitness spaces; and particular attention to healthy spaces, including an advanced air quality system. The building will feature enhanced air filtering and a fresh air make-up system to compensate for airborne pollution from two nearby highways.

John Quincy Upper School Rendering
Photo credit: HMFH Architects

The zero-carbon facility will be powered entirely by electricity, and rooftop photovoltaic arrays will provide 14% of the building’s power.

“Fitting a robust educational program onto this dense, urban site was paramount in our planning,” said Pip Lewis, AIA, Project Director with HMFH Architects. “Equally important was weaving the school appropriately into the urban and neighborhood context, which required thoughtful consideration from streetscape to skyline.”

Construction is being funded through the City of Boston and the Massachusetts School Building Authority. Turner Construction will serve as the project’s construction manager, and Skanska USA Building will serve as the owner’s project manager.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • Minnesota District Completes Major Renovations, Expansions to High School

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced that it has completed the renovation and expansion of White Bear Lake Area High School, according to a news release. The school’s final addition, a new 845-seat Performing Arts Center, was finished in November.

  • Kimball International Launches Season 5 of Alternative Design Podcast

    Commercial furnishings manufacturer Kimball International recently premiered the fifth season of its Alternative Design podcast, according to a news release. The first episode was released on March 17, and new episodes will launch monthly. The podcast discusses forces that shape built environments, from work to housing to healthcare to human wellness.

  • DreamBox Math

    Discovery Education Debuts Enhancements to DreamBox Math

    Discovery Education recently announced that DreamBox Math, an online math program for K–8 students to supplement core instruction, has been updated to improve accessibility for K–5 students, according to a news release. DreamBox Math provides personalized instruction by adapting to individual learners’ responses and providing an engaging, dynamic learning environment.

  • Studio G Announces Completion of New Massachusetts Elementary School

    The Groton-Dunstable Regional School District in Groton, Mass., recently announced the completion of a new elementary school, according to a news release. Florence Roche Elementary School measures in at 110,000 square feet and has the capacity for 645 students in grades K–4.