Greenheck Announces Redesign for Energy Core Ventilator Line

Air movement, control and conditioning solutions company Greenheck announced this week that it has redesigned its Energy Core Ventilator (ECV) line. According to a news release, the upgrade is meant to ensure the best possible unit performance within the smallest available footprint for space-sensitive installations either indoors or outdoors.

The press release states that the new ECV units feature direct drive plenum fans with variable frequency drives (VFDs). The new fans replace the more standard forward-curved fans to reduce motor horsepower requirements and the associated electrical wire and circuit breaker sizes. The VFD facilitates balancing during start-up, and the removal of belts simplifies maintenance procedures. It also features reduce sound power levels as backed by radiated sound data tested in accordance with AMCA 320-07.

Greenheck Energy Core Ventilator ECV 30
Photo courtesy of Greenheck

The ECV line has an airflow capacity of up to 5,000 cfm and comes with an AHRI Certified fiber membrane core or washable polymer core. Other model ECV features include double-wall construction with optional lift-off or hinged access for flexibility during new or retrofit installations. The standalone microprocessor controls allow for the management of downstream electric heaters and heating or cooling coils. Other options include frost, fan speed and economizer controls.

The energy core ventilators were designed for environments like schools, residence halls, hospitals, nursing homes and offices, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Michigan School District Installs New Gun-Detection Platform

    Williamston Community Schools in Williamston, Mich., recently announced that it has installed the ZeroEyes gun-detection video analytics platform for its five schools, according to a news release. ZeroEyes is the only solution of its kind with a U.S. Department of Homeland Security SAFETY Act Designation and adds an AI gun-detection and intelligent situational awareness software layer into existing school security cameras.

  • Aims Community College to Build Workforce Innovation Center

    Aims Community College in Greeley, Colo., recently announced that it has broken ground on its new Aims Workforce Innovation Center (AWIC), according to a news release. The facility for workforce development, entrepreneurship, and education has a scheduled opening date of fall 2026.

  • UTEP Celebrates Construction Milestone for New Academic Building

    The University of Texas at El Paso in El Paso, Texas, recently held a “topping out” ceremony for its new learning complex, Texas Western Hall, according to university news. The construction milestone marks the placement of the last beam of a structure in progress.