Georgia District Installs Disinfection Devices on Buses

The Meriwether County School District in Greenville, Ga., announced this week that its school board has voted to install disinfection devices on buses. The devices are capable of reducing up to 99.96% of harmful viruses that travel via air and by surface transmission, including SARS-CoV-2.

“We were at risk of losing bus drivers due to fear of COVID,” said Dr. Robert Griffin, Meriwether Superintendent. “Now we can load, travel and unload our buses knowing the air and surfaces are disinfected.”

The school board has purchased 113 CASPR (Continuous Air and Surface Pathogen Reduction) transit units from the Atlanta-based BioShark. According to a press release, the CASPR units convert natural airflow into low levels of gaseous hydrogen peroxide. The device runs continuously while the vehicle is in operation and will replace the current methods of chemical spraying and cleaning the fleet of buses.

“Our goal is to provide peace of mind for students, parents, staff and bus drivers to breathe the air and touch the surfaces without fear,” said BioShark’s Shannon Grube. “This will result in savings by reducing substitute bus drivers and teachers.”

According to the news release, the device does not leave a residue or have a corrosive effect on bus metals or seats. Officials anticipate that this will also help reduce bus maintenance expenses.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wenger Corporation Publishes Theater Rigging Guide

    Wenger Corporation, which provides solutions for performing arts and music education spaces, recently launched a free educational resource guide, “Rigging Guide for Performance Spaces.” The 32-page e-book is available on the company website and provides a background in the technical knowledge required to help administrators and educators make decisions in the planning process.

  • How Data Increases Community Confidence in School Facilities

    In school districts across America, the start of a new school year is met with optimism and new beginnings. But as the back-to-school excitement wears off, it recedes to the reality that many school facilities are in the same state of infrastructural decline that they’ve faced for years, if not decades, as these facilities deteriorate.

  • Texas District, Balfour Beatty Partner for Multiple Construction Projects

    General contracting, construction management, and design-build services provider Balfour Beatty recently announced that two of its joint venture teams were selected by the Crowley Independent School District (CISD) in Fort Worth, Texas, for a series of district construction projects.

  • Illinois District Breaks Ground on Two New Junior High Schools

    Joliet Public Schools District 86 in Joliet, Ill., recently began construction on two new junior high schools—the district’s first new schools since 2011, according to a news release. New facilities for Hufford Junior High School and Gompers Junior High School will serve the east and west sides of the city and be built next to their current facilities, which will be demolished after the project is complete.

Digital Edition