North Dakota District Prepares for New High School

The planning process for a second high school for Minot Public Schools in Minot, N.D., is underway after voters passed a $109-million bond in December 2021.

The district is currently preparing schematics to determine the facility’s layout and contents; once those schematics are complete, the plans will enter the design and development phase and get details like furniture and fixtures. The district’s most immediate goal is to have construction drawings and to be preparing for project bidding by spring.

In addition to the new construction, the district also plans to convert its existing Minot High School Magic City Campus (which currently serves students grades 11-12) into a full, four-year high school, and the existing Minot High School Central Campus (which currently serves students grades 9-10) into a middle school.

“We’re feeling very good about the schedule. We should be easily able to make all of this transition by August of 2024,” said Minot School Superintendent Mark Vollmer. “Our goal is to, by May 1, to have the high school named and a mascot and colors, and actually beginning freshmen team sports next year that will be representing that new high school.”

Remodeling work at the Magic City Campus is set to include building a second gymnasium, adding locker space and renovating the school’s science and career and technical education areas. Local news reports that the district has applied for a $10-million career and technical education grant from the state of North Dakota to aid in the proposed construction.

Another task is to engage in boundary discussions to decide which elementary and middle schools will feed into which of the district’s two full-service high schools. “We believe once that high school is in place that we will see tremendous growth in that part of town,” Vollmer said. “Those decisions are going to be very emotional discussions, but exciting discussions for people. I think we just need to realize that at the end of the day, we’re not going to be overcrowded. We’re not going to be stuffing kids in portable classrooms anymore, and we’ll be making our educational opportunities more equitable for kids.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Oregon District Selects Builder for Multiple Renovation Projects

    The David Douglas School District in Portland, Ore., recently selected Balfour Beatty company Howard S. Wright to deliver $15.7 million in renovations and repairs across multiple schools and facilities, according to a news release. The district also partnered with BBL Architects for the projects’ designs.

  • DLR Group Hires New Higher Education Business Development Leader

    Integrated design firm DLR Group recently announced that it has named a new Higher Education Business Development Leader who will serve out of the firm’s New York studio, according to a news release.

  • LocknCharge Launches App-Based Smart Locker System

    LocknCharge, a developer of mobile phone charging, storing, security, and technology management solutions, recently launched the new FUYL Enhanced Smart Locker System, according to a news release. The app-based kiosk allows self-serve access to devices while also providing full security and control.

  • Case Systems makerspace

    Case Systems Launches Line of K–12 Learning Spaces Installations

    Case Systems recently announced the launch of SALTO, a line of classroom fixtures and installations for K–12 learning spaces like STEM labs, art rooms, and makerspaces, according to a news release. The product line is designed to provide teachers with flexibility and adaptability, enabling them to shift between collaborative and individual learning environments.

Digital Edition