Energy Infrastructure Upgrade to Save Georgia Tech $11.7M

Georgia Institute of Technology in Atlanta, Ga., recently partnered with facility energy solutions provider ABM Industries to upgrade campus STEM labs—and save about $11.7 million across ten years in the process.

The university discovered that about 30 percent of campus energy use came from 5 percent of its square footage. After identifying that campus lab spaces were consuming such a high proportion of energy, it set about looking for ways to cut lab space energy cost, reduce its carbon footprint and provide safe and reliable working environments.

According to a news release, an energy savings performance contract with ABM led to the decision to upgrade fume hood controls for about 140 lab spaces around campus with no upfront cost. During the 2020 fiscal year, the project reduced energy consumption in two campus buildings—the ES&T and UA Whitaker science buildings—by 73.7 percent and 52.7 percent, respectively. It also surpassed the guaranteed utility cost savings with an additional reduction of $173,167.

The fume hoods and snorkels have new safety controls that help improve the cost-effectiveness of proper ventilation and increase reliability. On-site technicians also now receive real-time data that allows them to respond to performance issues that could decrease airflow or result in potentially expensive downtime. The collective set of data also allows for ease of preventative maintenance to optimize performance.

Georgia Tech Energy Infrastructure Upgrade

The installation also meant coordinating with research teams around campus to minimize disruption to millions of dollars’ worth of ongoing research project. ABM coordinated with Georgia Tech leadership, Environmental Health and Safety, lab safety officers and research teams to complete the necessary work in each given lab space in less than a week.

“This project required a high level of coordination among a wide range of stakeholders to balance safety, functionality and efficiency while conforming to a very tight design and construction schedule,” said Greg Spiro, Senior Mechanical Engineer, Design and Construction at the Georgia Institute of Technology. “The ABM team completed construction ahead of schedule and the project has helped reduce energy usage.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Hartwick College Debuts Baking Innovation Lab

    Hartwick College in Oneonta, N.Y., recently debuted its new Baking Innovation Lab (BIL), part of the Hartwick Center for Craft Food and Beverage, according to a news release. The 3,500-square-foot facility serves as a lab for innovation, collaboration, and experimentation within the food and grain sector.

  • DLR Group Hires New Higher Education Business Development Leader

    Integrated design firm DLR Group recently announced that it has named a new Higher Education Business Development Leader who will serve out of the firm’s New York studio, according to a news release.

  • University of Kentucky Receives $2.5M Donation Toward Renovation Project

    The University of Kentucky in Lexington, Ky., recently announced that it has accepted a $2.5-million donation that will transform Pence Hall into the home of the university’s College of Communication and Information, according to a news release.

  • All Surfaces Announces New Director of Commercial Business Development

    Surface solutions provider All Surfaces recently announced that it has hired a new Director of Commercial Business Development in Torie Bonafede. Bonafede will work to build the company’s market presence in various categories and drive strategic initiatives to expand its commercial sales portfolio.

Digital Edition