Maine High School Starts Construction on $4.3M Athletic Complex

Kennebunk High School in Kennebunk, Maine, recently began work on a new $4.3-million athletic complex. Local news reports that voters approved a portion of the funding for the new project in May and approved the district’s overall operating budget in June. RSU 21 School Board Chair Art LeBlanc called the project “very exciting and long overdue,” as the existing athletic complex has fallen into disrepair in recent years.

During a presentation earlier this year, LeBlanc outlined some of the problems with the current facilities. The track was built in 2004 and is cracked and filled with holes. The bleachers were built in 2006, are not structurally sound and are not ADA-compliant. The 1980s-era lights are outdated, and poles have been damaged by wildlife. Finally, the field has drainage issues and is currently unusable for competition.

According to local news, the new complex will feature synthetic turf to support the school’s football, soccer, lacrosse and field-hockey teams. The turf is made of virgin EPDM material and is free of PSA toxins, as well as the contaminants usually associated with recycled rubber.

New home-side bleachers will cost $258,000, while another portable set will cost $170,000. A new press box will cost $212,000, the new lighting system $368,000, and track upgrades $125,000. Funding for the project is coming from $2.8 million from the district’s capital reserve fund, as well as $1.2 million left over from a previous construction project and another $250,000 previously allocated for track repairs.

The district partnered with CHA Consulting, Inc. to design and engineer the complex’s renovations in participation with local firms Sebago Technics and S.W. Cole. Further details about the project are available on the Maine Regional School Unit 21 website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • 5 Tips for New Teachers and Their Administrators on Classroom Design

    Recently, several school visits early in the academic year highlighted how many first-year teachers struggle to set up their classrooms effectively. It's evident that more can be done to better support them from the start, particularly in the area of classroom design.

  • University of Wisconsin-Milwaukee Debuts New Chemistry Building

    The University of Wisconsin-Milwaukee in Milwaukee, Wis., recently celebrated the grand opening of a new Chemistry Building, according to a news release. The facility measures in at 163,400 square feet, stands four stories, and has the capacity for about 5,000 chemistry and biochemistry students.

  • University of Kentucky Receives $2.5M Donation Toward Renovation Project

    The University of Kentucky in Lexington, Ky., recently announced that it has accepted a $2.5-million donation that will transform Pence Hall into the home of the university’s College of Communication and Information, according to a news release.

  • DLR Group Appoints New Senior Design Researcher

    Integrated design firm DLR Group recently announced that it has appointed Dr. Kati Peditto, Ph.D., EDAC, as the new senior design researcher for its research team, according to a news release. Peditto is a design psychologist who specializes in inclusive design and neurodiversity, joining the firm’s office in Denver, Colo.

Digital Edition