UAB Completes Phase I of STEM Complex Construction

The University of Alabama at Birmingham recently announced that the first phase of construction on a new Science and Engineering Complex is complete, according to a news release. The university is partnering with Hoar Construction on the three-phase project, which will unite all of the university’s basic science undergraduate and graduate programs underneath one roof. Phase I consists of a 138,842-square-foot, four-story facility featuring labs and classrooms for biology, chemistry, and physics, as well as administrative space.

“We are proud to deliver this project to the students, faculty, and staff at UAB, as the new Science and Engineering Complex represents a significant commitment to advancing the university’s prowess as a key research hub that enhances career opportunities and bolsters economic development across Alabama,” said Chad Holland, project executive at Hoar. “This project was completed at the highest quality for the next generation of students, leaders and innovators within science and engineering. Hoar remains steadfast in our commitment to build top-tier projects across all realms of higher education, and we are honored to contribute to the university’s growth in our hometown of Birmingham.”

The facility was designed as a team-learning environment that will promote student collaboration between both students and faculty in different scientific disciplines. Specialized workspaces include an optics lab, research labs for student shadowing, and cold-growth environment rooms.

The news release reports that Hoar used computerized, 3D models of the structure to address design concerns during the construction process. The models were used to assess material quantities, optimize item placement, and identify design conflicts. Additionally, Building Information Modeling (BIM) were used to streamline the installation of plumbing and electrical components to save both time and cost.

The university is also partnering with lead architect Goodwyn, Mills & Cawood for the building’s design, as well as Lord Aeck Sargent (LAS) for lab and research space consulting.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • Tennessee District Opens New Central Office

    The Franklin Special District (FSD) in Franklin, Tenn., recently held a ribbon-cutting ceremony for its new 38,400-square-foot Central Office facility, according to a news release. The district partnered with Wold Architects and Engineers to create an administrative space designed to boost productivity, collaboration, and employee wellness.

  • Norfolk State University Partners with Voltus for Energy Efficiency Program

    Norfolk State University recently announced that it has selected Voltus, Inc., to implement the university’s new energy efficiency program on its campus in Norfolk, Va. According to a news release, the partnership’s goal is to reduce campus energy use by 27% by the year 2030 and support grid reliability across the state of Virginia.

  • Zurn Elkay Announces Updated Line of Filtered Bottle Filling Stations

    Zurn Elkay Water Solutions recently released an updated line of its Elkay Filtered Bottle Filling Stations, according to a news release. The new line features a sleeker design and functional upgrades to help simplify filter maintenance and reduce long-term labor costs.

  • Quadient Achieves 25,000 Locker Installations Worldwide

    Global automation platform Quadient recently announced that it has acquired Package Concierge, a U.S.-based parcel management solutions provider, according to a news release. The acquisition pushes Quadient over the 25,000-unit milestone of global installations.