Auburn University Breaks Ground on STEM + Agricultural Sciences Complex

Auburn University in Auburn, Ala., recently announced that construction on a new STEM and Agriculture Sciences Complex has begun, according to a news release. The new facility measures in at 285,000 square feet and will cost an estimated $184 million. The university is partnering with Hoar Construction, construction manager JE Dunn, and designers of record Goodywn Mills Cawood & Lord Aeck Sargent on the project, which has an estimated completion date of summer 2026.

The complex features three buildings connected via pedestrian bridges and a shared basement. Each building will include teaching labs with state-of-the-art technology, research labs, a teaching garden, and communal spaces, the news release reports. It will provide a centralized space for the university’s Departments of Biological Sciences; Geosciences; Mathematics and Statistics; Crop, Soils & Environmental Sciences; and more. Certain spaces will also be equipped to house aquatic animals and insects.

“We are honored to have been chosen to oversee construction of this state-of-the-art development, which is one of the highest dollar-value projects in Auburn’s history,” said Hoar Project Manager Joel Brown. “This complex is set to greatly enhance the learning experience and capabilities for Auburn’s students and will pave the way for our next generation of leaders within science, technology and agriculture. We look forward to working alongside our invaluable project partners to deliver this project on time and without any disruptions to student life.”

The news release reports that once construction is complete, the facility will aim to achieve LEED Silver Status.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Virginia Tech Establishes New Facility for School of Construction

    Virginia Tech recently partnered with construction management firm Procon Consulting to establish the Procon Innovation Center on its campus in Blacksburg, Va., according to a news release. The facility inside the university’s newly built Hitt Hall will offer hands-on collaboration and learning opportunities for students in the Myers-Lawson School of Construction and College of Engineering.

  • Los Angeles Unified School District Adopts VR Learning Platform

    The Los Angeles Unified School District (LAUSD) recently announced its partnership with Avantis Education to bring educational virtual and augmented reality (VR/AR) solution ClassVR to its students. A news release reports that the district has already deployed more than 16,000 ClassVR headsets as part of the Los Angeles Unified Instructional Technology Initiative.

  • New Elementary School Opens in South Bronx, N.Y.

    Forte Construction Corp. recently announced that it has completed construction on P.S. 487, a new four-story elementary school in the South Bronx, according to a news release. The school is open for the current academic year and will serve more than 500 students in grades PreK–5.

  • California District Completes Second Phase of Construction on Innovation Campus

    The Milpitas Unified School District (MUSD) in Milpitas, Calif., recently announced that Phase Two of construction is complete on the MUSD Innovation Campus, according to a news release. The district is partnering with Blach Construction and Quattrocchi Kwok Architects (QKA) on the education and workforce development center, which will support Calaveras Hills High School.

Digital Edition