Prairie View A&M University Debuts New Academic Building

Prairie View A&M University in Prairie View, Texas, recently opened a new, three-story Engineering Classroom and Research Building (EnCARB), according to a news release. The 106,000-square-foot facility provides academic, research, and technical space for the university’s Roy G. Perry College of Engineering. The university partnered with integrated design and engineering firm Stantec for the project.

The new building features more than 30 labs for chemical, civil engineering, and mechanical departments, as well as multidisciplinary research in fields like space exploration, data analytics, robotics and artificial intelligence, 3D manufacturing, and more. It also includes built-in flexible spaces to support different pedagogies and a maker space.

“EnCARB will allow PVAMU to take their laboratory instruction and research pursuits to the next level with state-of-the-art facilities that are flexible by design and will allow them to be nimble and adapt in the fast-evolving field of engineering,” said Stantec principal Cynthia Labelle. “Students will learn and grow across many engineering disciplines in a future-focused learning environment.”

EnCARB will also be one of a small number of U.S. facilities to feature a microgravity drop tower for research regarding space-related conditions. Stantec has previously completed STEM-related facilities at universities like Yale, the University of Texas at Dallas, Central Michigan University, and the University of Texas at Permian Basin, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Florida District Selects Designer for K–8 Prototype Campus

    St. Lucie Public Schools in St. Lucie, Fla., recently announced that it has selected Spiezle Architectural Group, Inc., to design its new Western Grove K–8 prototype campus, according to a news release. Construction on the 217,500-square-foot facility will begin in February 2025 and is scheduled for completion in August 2026.

  • Minnesota K–12 District Completes New Elementary School

    Rock Ridge Public Schools in Virginia, Minn., recently announced that construction of the district’s newest elementary school is complete. North Star Elementary cost $28.5 million and has the capacity for 600 students in grades 3–6, according to a news release.

  • college student sitting at a desk, studying on a glowing laptop with geometric shapes representing technology in the background

    Pearson Introduces New AI-Powered Study Tools

    Digital learning company Pearson has launched several new AI-powered tools to help provide students personalized help from within their e-textbooks or study platforms.

  • San Diego High School Hits Construction Milestone

    Part of a whole-site modernization project at Mira Mesa High School in San Diego, Calif., recently reached a construction milestone. The final steel beam of the new classroom and student services facility was put into place, completing the building’s structural framework.

Digital Edition