California Private High School Completes New Community Performing Arts Center

Sonoma Academy—a private, co-ed college preparatory school in Santa Rosa, Calif.—recently announced that construction is complete on a new, 350-seat Community Performing Arts Center, according to a news release. The facility will play home to the school’s music, theater, and film productions and host various types of programming for the community at large. The school partnered with Quattrocchi Kwok Architects (QKA) and WRNS Studio for the project’s design, DPR Construction for construction, and The Shalleck Collaborative as a theatrical consultant.

“The opening of the Community Performing Arts Center marks the start of a new era for our school,” said Tucker Foehl, Head of School at the Sonoma Academy. “This beautiful, state-of-the-art facility will provide a gathering place for our school community and a home for our stellar theater, music and dance programs. The high-tech features and thoughtfully designed spaces will allow us to stage more ambitious productions and involve more student performers than ever before. Equally exciting is the opportunity we have to welcome the surrounding community to our campus, as we expand our roster of events and develop partnerships with other local organizations.”

The facility measures in at 27,500 square feet and includes amenities like a 350-seat theater, stage, full orchestra pit, and supporting spaces. The AV system uses a Dolby Laboratories sound system and a Christie Digital 4K laser projector. Other amenities include an Actors Studio with a classroom and rehearsal space, a scene ship for backdrops and stage scenery, dressing rooms, additional classroom and storage space, and a lobby and box office, according to the news release. Sustainability features include energy-efficient lighting and HVAC systems, as well as a displacement heating and cooling system for audience seating.

“It has been a remarkable experience to work alongside Sonoma Academy and the collaborative project team to design this truly remarkable and cutting-edge performing arts building,” said Steve Kwok, QKA Principal Emeritus. “The various spaces will allow students to participate in the complete production of a performance, and it will certainly be an invaluable community asset.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Oregon District Selects Builder for Multiple Renovation Projects

    The David Douglas School District in Portland, Ore., recently selected Balfour Beatty company Howard S. Wright to deliver $15.7 million in renovations and repairs across multiple schools and facilities, according to a news release. The district also partnered with BBL Architects for the projects’ designs.

  • Massachusetts Charter School Opens New Academic Building

    The Advanced Math and Science Academy Charter School (AMSA) in Marlborough, Mass., recently held a ribbon-cutting ceremony for a new academic building, according to a news release. The 17,000-square-foot space will serve as a classroom and science lab building for the student population of almost a thousand in grades 6–12.

  • Electrifying Bus Fleets

    Now is an excellent time for K-12 “yellow” school buses, college campus transportation, and public transit systems to transition to zero-emission electric buses instead of traditional gas or diesel-powered models.

  • New Jersey High School Debuts Auditorium Renovation, Technical Upgrades

    Plainfield High School in Plainfield, N.J., recently completed a series of construction projects including an auditorium renovation, a new eSports gaming arena, and a black-box theater, according to a news release. The school partnered with PureTek Group to install the Pliant Technologies CrewCom professional wireless intercom system.

Digital Edition