Pick Everard Completes New Special Education School in England

Multidisciplinary consultancy Pick Everard recently announced that construction is complete on a new specialist school for students with Social, Emotional, and Mental Health (SEMH) needs in Shepshed, Leicestershire, England, according to a news release. Bowman Academy will open in September 2024 and serve students ages 4–16.

The academy will feature amenities like vinyl spaces for practical learning purposes, a sensory dark room, a calming room, and practical teaching spaces including a domestic kitchen and library. The school has capacity for 64 students, 16 primary-aged children (two ground-floor classrooms) and 48 secondary-aged children (two ground-floor classrooms and four more on the floor above).


Bowman Academy
Image courtesy of Pick Everard

“Working on SEND [Special Educational Needs and Disabilities] schools is always a privilege, with unique design applications and special consideration for the needs of a diverse range of learning,” said Joe West, Pick Everard associate. “Creating an environment that is both functional and comfortable for pupils was central to the aims of the project, which should in turn aid the school in attracting and retaining students in the area.”

The school also partnered with general contractor Bowmer + Kirkland for the project’s construction.

Sustainability initiatives include a “fabric-first” approach to increase insulation, heat recovery, and air-tightness. The school also features high-efficiency boilers, LED lighting with occupancy and daylight controls, and a photovoltaic panel array that offsets ten percent of the school’s energy consumption.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • How Data Increases Community Confidence in School Facilities

    In school districts across America, the start of a new school year is met with optimism and new beginnings. But as the back-to-school excitement wears off, it recedes to the reality that many school facilities are in the same state of infrastructural decline that they’ve faced for years, if not decades, as these facilities deteriorate.

  • Case Systems makerspace

    Case Systems Launches Line of K–12 Learning Spaces Installations

    Case Systems recently announced the launch of SALTO, a line of classroom fixtures and installations for K–12 learning spaces like STEM labs, art rooms, and makerspaces, according to a news release. The product line is designed to provide teachers with flexibility and adaptability, enabling them to shift between collaborative and individual learning environments.

  • Massachusetts High School to Build New Athletics Facility

    Middlesex School, which serves boarding and day students in grades 9–12, recently moved forward with plans to build a new athletics facility for its campus in Concord, Mass., according to a news release. MassDevelopment recently issued a $43.7-million tax-exempt bond to fund the project.

  • Minneapolis Public Schools Continues Work on New Construction, Renovation Projects

    Minneapolis Public Schools in Minneapolis, Minn., is working with integrated construction management firm Kraus-Anderson on renovations to North High School that include a new Career & Technical Education (CTE) Center, according to a news release. The three major components of the project are new academic and athletic spaces, a new central student commons, and a North CTE Center.

Digital Edition