Planning for the Avian Flu

Lately, the media has carried numerous articles about the Avian Flu. Articles that I have read focused largely on reports of new cases. Indonesia is the current“hot bed” for new cases, some of which have resulted in deaths.

The truth of the matter is that, at this time, researchers have not yet identified a single, verified case of this flu virus having been communicated among human beings. Therefore, researchers have not yet had access to the actual mutation of this virus from which we need protection. Even when they do discover something that might helps us, they already know that its application and availability will be very limited, at least for the first six months or so.

Why is this important to us in the Facilities business? The answer is simple: we need to prepare ourselves and our organizations for the arrival of the Avian Flu. The best that could happen is that it does not come. It is not substantially different, if we think about it, from preparing for an earthquake or other natural disaster. We prepare while hoping we will never need it.

Some of us may remember the flu pandemic that struck the United States in the mid-1950s. Approximately 30 to 40 percent of our population became infected, at any one time, by this nasty little bug. Some experts now predict that the Avian Flu pandemic could easily match the impact of that one. This means that, at any one time, we could be without a third of our staff for days or weeks at a time. At the same time, just as many of the students, faculty and other support staff will be away from the campus. Finally, our suppliers and the contractors that we will so desperately need will have similar challenges. As we prepare, we must keep in mind some realities or probabilities:

• If the pandemic hits, odds are that colleges and universities will need to lock their doors upon orders from state and/or local health officials. They may lock down places where large groups of individuals tend to congregate, including airports, bus stations and other forms of mass transportation, and hotels, among others.
• Even your healthy employees will want (and should be encouraged) to take care of their ill family members first, so that they can focus on institutional issues when they are able to work.
• Scientists are quite certain that this virus communicates only through direct contact, such as when someone expectorates or does not wash his/her hands. HVAC and fan systems will not play a role in the proliferation of this flu.
• We need to plan to operate with a drastically reduced staff. We should therefore reemphasize cross training, always a good idea in any case. We should make solid arrangements with contractors to assist to whatever degree they can when our own staff is insufficient and if the contractor(s) is still available. (We could approach general contractors already working at the institution to provide some of these critical services.)
• We need to identify and provide an inventory of critical materials and supplies that we may need during an extended campus closure.
• If health officials do close the campus, we must have arrangements in place to secure the residence halls if students are sent home (assuming they can get there). We must be able to secure other campus buildings and provide regular patrols. Since we have research buildings on campus, we must be aware that researchers may not have access to their labs, undoubtedly creating some volatile situations in more ways than we care to imagine.
• We should develop, if we do not already have it, a prioritized list of buildings, identifying which ones must get first response and at what level we will provide service.

It is easy to see that planning for a pandemic, such as the Avian Flu, is quite similar to planning for other types of hazardous events or emergency situations. One huge difference is that the initial impact will not be to our facilities. Instead, it will initially fall squarely on our people. If we do not have reasonable preparations in place before then, that void will have disastrous impacts on our buildings — if the H5N1 (Avian Flu) pandemic does in fact happen.

Planning and preparing for an event such as this is expensive. Not preparing is priceless.

For more information, access this Website: www.cdc.gov/flu/avian/gen-info/facts.htm. You should also access your own state’s health department Website.


Pete van der Have has recently retired as the assistant vice president for Plant Operations at the University of Utah in Salt Lake City and is working as an independent consultant. He can be reached at [email protected].

Featured

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • DLR Group Appoints New K–12 Education Practice Leader

    Integrated design firm DLR Group recently announced that it has named its new global K–12 Education leader, Senior Principal Carmen Wyckoff, AIA, LEED AP, according to a news release. Her teams have members in all 36 of the firm’s offices in the U.S., Puerto Rico, the U.S. Virgin Islands, Europe, and Asia.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

Digital Edition