Mark Twain Elementary School

SHW Group - Houston, Texas

Project of Distinction Winner 2014 Education Design Showcase

Mark Twain Elementary School

Project Fact Sheet

Facility Use: K-12 Elementary
Project Type: New Construction
Category: Whole Building/Campus Design
Location: Alvin, TX
District/Inst.: Alvin ISD
Chief Administrator: Jeff Couvillion
Completion Date: June 2012
Design Capacity: 800 students
Enrollment: 600 students
Gross Area: 102,000 sq.ft.
Space per pupil: 127 sq.ft.
Site size: 13 acres
Cost per student: $17,250
Cost per sq.ft.: $135.00
Total project cost: $13,800,000

Mark Twain Elementary SchoolThe existing Mark Twain Elementary School was the first elementary school to be built in Alvin ISD. While it served the district well for 47 years, a steadily increasing student population necessitated school growth as well. During Bond Planning it was determined a new Mark Twain Elementary School replacing the original building was the best strategy to increase the capacity from the current 600 students, to the necessary 800 students.

This new elementary school steps into uncharted design territory for the district as their first two story elementary school. This project ensures a smaller footprint, translating into less up front land costs, as well as lower roof expenditures for the lifetime of the building. Additionally, a two story design permits the majority of classrooms to have exterior windows, providing natural light and exterior views. This coupled with solar tubes makes natural day-lighting a viable lighting solution. Geothermal ground source heat pumps will also serve to more efficiently cool the building.

Mark Twain Elementary SchoolAnother key element in the design is visible in the centrally located library. The library spans the full height of the building plus additional clerestory windows. Oriented along the N/S axis, clear glazing creates the exterior boundaries of the library. This transparency provide ample natural light and establishes a strong visual connection between the interior and exterior environments. By utilizing an open concept, the library’s interior boundaries are defined through subtle ceiling height and material changes; emphasizing the importance of the relationship with the school as a whole.

Project Description:

1) Control of Institution: Public
2) Type of Institution: Traditional

Locale:

Suburban

Mark Twain Elementary School Mark Twain Elementary School

Methodology & Standards:

Prototype Design

Funding Method(s):

Primary Source: Primary Source: Revenue Bonds

Project Delivery Method(s):

Qualifications-Based Selection

Sustainable/Green Design:

Site Selection and Development: Stormwater Management; Building Orientation
Energy Efficiency and Conservation: Energy Efficiency; Building Automation/Energy Management Systems
Indoor Environmental Quality: Use of Daylighting; Electric Lighting Systems/Controls
Teaching Tool: Building as a Teaching Tool

Mark Twain Elementary SchoolArchitect(s):

SHW Group - Houston, Texas
Edward Blanco (PA) Sam Savage (PM)
20 East Greenway Plaza
Ste. 200
Houston, TX 77046
713-548-5700
[email protected]
http://www.shwgroup.com

Associated Firms and Consultants:

Landscape Architecture: KGA/DeForest
General Contractor: Gamma Construction Company
Structural Engineer: SHW Group, LLP
Electrical Engineer: CMTA
Mechanical Engineer: CMTA
Civil Engineer: Brooks and Sparks
Acoustical Consultant: HFP
Technology Consultant: CMTA
Food Service/Kitchen Consultant: FCA Design
Other: CMTA (Plumbing Consultant)

Featured

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

Digital Edition