Denver School District Recycles Old Ceilings

Recycling Old Ceilings

Denver Public Schools found a way to promote sustainability and benefit their own construction projects with Armstong’s Recycling Program.

With the adoption of its Sustainability Management Plan, Denver Public Schools (DPS) is challenging students, teachers, staff, and parents to practice an “ethic of sustainability” to help reduce the impact its 185 schools have on the environment.

A major focus area of the plan calls for measurable improvements in landfill diversion rates and reduced greenhouse gas emissions from solid waste.

When renovations began on a 14-story office building DPS was converting to a vertical campus in downtown Denver, school officials met with the contractor to set sustainability goals for the project. “Recycling and repurposing of the materials that came out of the building was probably the number one item on that sustainability list,” explains DPS Construction Project Manager Katheryn Zeeb.

A large part of the construction waste consisted of old ceiling tiles that had been removed from the building during renovation. The contractor recommended that DPS recycle the old ceiling tiles through the Armstrong Ceiling Recycling Program.

The program enables building owners to ship discarded ceiling tiles from demolition and renovation projects to the nearest Armstrong plant as an alternative to landfill disposal. The discarded tiles are then used to manufacture new ceiling tiles.

Through its participation in the program, DPS eventually recycled over 131,000 square feet of used ceiling tiles, diverting nearly 67 tons of construction waste from landfills.

“The recycling program has proven to be advantageous from so many different levels – from savings on container costs and landfill fees to stewardship of resources for future generations,” says DPS Construction Services Director James Allen. “It’s been a good experience. Now that we’ve done it once, we’ll continue to do it. We’re a school district and we are life-long learners.”

www.armstrong.com

This article originally appeared in the issue of .

Featured

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition