Guidance For Schools Integrating Indoor Air Quality And Energy Efficiency Available From EPA

The U.S. Environmental Protection Agency (EPA) published a guidance in 2014 to help school districts protect indoor air quality while increasing energy efficiency during school renovations. When it was released, Janet McCabe, who was an acting assistant administrator for EPA’s Office of Air and Radiation, said, “This guidance provides common-sense solutions for improving energy efficiency and indoor air quality in schools across the country. By using these guidelines, school districts can cut their energy bills and help ensure that students have a healthy and safe learning environment.”

The EPA says both energy management and protection of indoor air quality (IAQ) are important considerations for school facility management during energy upgrades and retrofits, and schools can protect occupant health by addressing both goals holistically. These renovation and construction activities can create dust, introduce new contaminants and contaminant pathways, create or aggravate moisture problems, and result in inadequate ventilation in occupied spaces. EPA’s “Energy Savings Plus Health: Indoor Air Quality Guidelines for School Building Upgrades” offers opportunities to prevent and control potentially harmful conditions during school renovations.

The practices outlined in the guidance support schools as healthy, energy-efficient buildings that play a significant role in local communities. Nearly 55 million elementary and secondary students occupy our schools, as well as 7 million teachers, faculty and staff. In addition, many communities use school buildings after regular school hours as after-care facilities, recreation centers, meeting places and emergency shelters during natural disasters.

The guidance builds on EPA’s existing programs, such as ENERGY STAR for schools and “Indoor Air Quality Tools for Schools,” which helps schools identify, resolve and prevent air quality problems, often with low- and no-cost measures.

Today, half of the schools in the United States have adopted indoor air quality (IAQ) management plans, the majority of which are based on EPA’s IAQ Tools for Schools. However, there are still about 25 million children in nearly 60,000 schools who are not yet protected by IAQ management programs.

Go to www.epa.gov/iaq/schools/energy_savings_plus_health.html to download the guidance and www.epa.gov/schools for other school environmental health resources.

This article originally appeared in the issue of .

Featured

  • Photo courtesy of Kraus-Anderson

    Minnesota District Completes $49.7M Addition, Renovation Project

    St. Paul Public Schools in St. Paul, Minn., recently announced the completion of a $49.7-million addition and remodeling project at two district schools, according to a news release.

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.