EDspaces Named One of 50 Fastest Growing Shows

Silver Spring, Md. — Trade Show Executive (TSE) magazine has named the Education Market Association’s EDspaces as one of the 50 Fastest-Growing Shows by total attendance from 2014 to 2015. EDspaces was also identified by TSE as a Fast Tracker (Top 100) for growth by net square feet of exhibit space. The 2015 show held in New Orleans, October 28-30, 2015, had record attendance among both architects and school purchasing officials and featured 152 exhibitors in 470 10’ x 10’ booth spaces.

“The Fastest 50 Class of 2015 once again includes a mix of established shows and up-and-coming events in nearly every industry sector, proving that face-to-face exhibitions are important assets to the business world,” said Darlene Gudea, President of Trade Show Executive Media Group.

EDspaces is the international tradeshow and conference that brings together all the key professionals who plan, design and manage innovative learning environments with the dealers, service providers and manufacturers who support them. EDspaces attendees include buyers from school districts, colleges & universities from across the country; dealers of all types; architects and interior designers. The American Institute of Architects Committee on Architecture for Education holds its annual Fall Conference at EDspaces.

“We are very excited to see the industry rally around EDspaces’ mission to bring together all of the key stakeholders that influence innovative learning environments.” said Jim McGarry, President & CEO of the Education Market Association.

A call for presentations for the 2016 EDspaces, November 2-4, 2016 in Cincinnati, Ohio, is currently underway. The EDspaces Planning Committee has chosen to coordinate the theme of the event with the AIA-CAE Conference: Visioning and Re-visioning. Sessions that explore the ways in which pedagogical innovation and cutting-edge design impact and influence each other will be balanced with others that focus on what environmental factors contribute to higher student achievement. Industry thought-leaders are encouraged to submit a proposal by the March 30 deadline.

The Education Market Association (EDmarket) provides events, opportunities, resources, and leadership that improve student outcomes by advancing the educational products marketplace. Visit www.ed-spaces.com for information on EDspaces, the conference and expo for innovative learning environments.

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • KWK Architects Announces Full Transition to Lawrence Group Branding

    KWK Architects recently announced that it will complete its transition to the Lawrence Group brand effective July 1, according to a news release. The merger marks the end of a three-year strategic integration process that began in March 2023 to unite the firms.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.