Energy Efficiency for a Living Building

empty classroom

Mitsubishi Electric helped the Willow School to meet the Living Building Challenge by providing energy efficient solutions that met the challenge’s guidelines.

When Mark and Gretchen Biedron co-founded the The Willow School, in Gladstone, N. J., their vision was to create a school that provides students with a space that celebrates learning and collaboration, and that fosters ethical relationships between people and the natural systems that support them. Sustainability drives both the curriculum and building design for Willow, so when the school was designing its fourth building — the Health, Wellness and Nutrition Center — the project team selected a Variable Refrigerant Flow (VRF) zoning system from Mitsubishi Electric Cooling & Heating (Mitsubishi Electric).

Willow has a proud history of green building. In 2002, it built the first LEED Gold certified school building in the United States and, in 2007, the first LEED Platinum certified school in New Jersey. Ever the pioneers, Biedron and his team wanted to up the ante for the new Center. With this project, we were focused on taking the Living Building Challenge (LBC).

Each decision the project team made took careful consideration. Vin Farese, principal at Loring Consulting Engineers (project engineers) says, “Every load was tracked and analyzed. Every amp and watt was accounted for. Nothing was missed” while following the rigid LBC guidelines.

Biedron says, “To be Living Building certified, we had to make sure that we were getting our products from within a certain distance, but Mitsubishi [Electric] products just weren’t within that limit. However, Mitsubishi [Electric] quickly provided us with all of the documentation we needed to be able to get an exception to this rule. We proved that their products would be so energy-efficient over their lifetime that the one-time transportation expense would deliver a system that would ultimately save on cost and energy year after year after year.”

www.mitsubishielectric.com

This article originally appeared in the issue of .

Featured

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition