Why do we need a fire sprinkler shut-off tool?

The best way to protect a building and its occupants from fire is to have an automatic fire sprinkler system. However, when a fire sprinkler system accidentally activates it can cause hundreds of thousands of dollars in damage. Talk to anyone who has had a fire sprinkler accident and you will hear just how catastrophic water damage can be. I have seen sprinkler accidents caused by everything from a kickball game in a dorm hallway to moving furniture in a science lab to hanging a clothes hanger on a sprinkler head in a classroom. When these accidents occur, a fire sprinkler shut-off tool can immediately stop the flow of water to the activated head while keeping the rest of the sprinkler system functional.

A single fire sprinkler head can expel between 30 to 100 gallons per minute, causing an estimated $1,000 of damage per minute. As a firefighter, I have personally seen over 30 stories of a building destroyed from a single sprinkler head. In most cities, a building’s water supply can only be shut off by the fire department. Waiting for firefighters to be dispatched, respond, locate, access and shut down the system can result in hundreds of gallons of unclean water pouring into your hallways and classrooms. Stopping the activated head quickly using a sprinkler tool helps avoid expensive damages and keeps every sprinkler head in the building pressurized. Your buildings stay open and operational while your students and faculty remain safe and protected.

Whether you are looking to protect dorm rooms, lab equipment or classrooms, you cannot afford to have a sprinkler accident without keeping a fire sprinkler shut-off tool on site.

This article originally appeared in the issue of .

About the Author

Matt Scarpuzzi is a San Diego firefighter and owner of Quickstop Fire Sprinkler Tools (www.quickstoptool.com). Contact him at [email protected] or 858/750-2232.

Featured

  • CSU Pueblo Installs Solar-Powered Charging Benches

    Colorado State University Pueblo (CSU Pueblo) recently announced that it has installed four solar-powered charging benches from Bluebolt Outdoor, LLC, according to a news release.

  • Midland ISD Starts Construction on Two New High Schools

    The Midland Independent School District recently announced that it will break ground on two new high schools in Midland, Texas, according to a news release. The district is partnering with Pfluger Architects, Lee Lewis Construction, and Satterfield & Pontikes to create a total of over 1.5 million square feet for 8,400 students in grades 9–12.

  • Duncanville High School Breaks Ground on New CTE Building

    Duncanville High School in Duncanville, Texas, recently held a groundbreaking ceremony for the newest addition to its campus, a Career and Technical Education (CTE) facility. The new building is part of a larger CTE expansion project for the school included in a 2023, $170-million bond program.

  • Key Considerations for Office-to-Higher-Education Facility Conversions

    Since the onset of the COVID-19 pandemic, office-to-alternative-use conversions have become a recurring subject of urban development discourse. Office utilization rates across major U.S. cities remain below 50%, with vacancy rates exceeding 27% in San Francisco and 16% in New York. Higher education facilities present programmatic and spatial use cases that align readily with the typical characteristics of commercial office buildings.

Digital Edition