What Is the Difference Between Emergency Response and Pre-Incident Plan?

Emergency situations come in many forms. While some are predictable (such as hurricanes and severe winter storms), others (such as tornadoes, active shooters, biohazard incidents) happen with little or no warning. In any of those cases, excellent emergency response is critical to saving lives and property.

We are often asked, or find ourselves needing to clarify, the difference between an emergency response plan and a pre-incident plan. An emergency response plan defines the roles, responsibilities and procedures that need to go into effect during an emergency. It should include evacuation and lock-down procedures, as well as focus on communications processes both internally and with external parties. Regularly scheduled drills also are essential for optimum preparation.

The pre-incident plan (or pre-plan) is a tool that centralizes all critical building and property information required by first responders so they can act with knowledge. This should include site plans, floor plans, hazardous material details, locations of utility shut-offs and fire hydrants, geographical maps and other critical building and infrastructure details. Hosted either by property management or a municipal fire department, an up-to-date plan is essential to reduce the risk to occupants, responders and the property.

A digital pre-plan makes the information highly shareable between property management, first responders and mutual aid stations. This is critical if there are occupants with special needs, such students with cognitive or developmental disabilities. Your pre-plan should supplement and complement any emergency response plan.

This article originally appeared in the issue of .

About the Author

Len Karson is an account executive at RealView, LLC, developers of digital preincident plan technology. He can be reached at [email protected].

Featured

  • Kenall Introduces Millenium Flair Series

    In a move aimed at modernizing institutional lighting without compromising on durability or performance, Kenall has launched its new Millenium Flair series, according to the Kenall website.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • Dallas ISD Debuts New Peabody Elementary School

    The Dallas Independent School District in Dallas, Texas, recently announced the completion of the new facility for George Peabody Elementary School, according to a news release. The district partnered with Pfluger Architects and REEDER Construction on the 70,807-square-foot replacement campus, which has the capacity for 550 students.

  • cutaway view of a modern school building, showing various rooms and zones

    Layering AI into HVAC Systems Shows Reduction in Carbon Emissions

    Heating and cooling systems are just one of the many new ways that AI can be integrated into schools. According to a new study from Schneider Electric's Sustainability Research Institute, AI-powered HVAC systems in schools can lead to significant carbon emissions savings.

Digital Edition