Making Old New Again

Performing Arts Center RenovationGiven the budget constraints being placed on academic facilities today, when an existing performance space is scheduled for a renovation on a campus, it is an opportunity to demonstrate the value of the arts to students and the extended community. Similar to public buildings in a city, a performing arts center on a campus reinforces the power of community — and sometimes is even utilized by the community for public performances. As a result, the facility itself needs to become a landmark on campus, demonstrating the support of the arts.

At Polytechnic High School in Long Beach, Calif., LPA worked with the district and a team of consultants to enhance their existing 34,000-square-foot auditorium building with a seismic retrofit and accessibility, fire and life safety upgrades. Originally built in 1930, the building was reconstructed in 1934 in an Art Deco style, after the 1933 Long Beach earthquake. Working with a historical consultant, modernizations to the narrow balcony and main house floor improved supervision of the space, acoustical properties and audience sight lines. New seating was provided at the floor of the main house and the existing 1930s seats were refurbished and located at the stadium seating section of the house.

Performing Arts Center Renovation 

Curtains up. Modeled on a Hollywood studio, the Tahoe Arts & Design Academy (TADA), in South Lake Tahoe Calif., included the reconstruction of an existing 15,000-square-foot performing arts facility and new construction of a 10,000-square-foot production facility addition. TADA features a 300-seat theater, Foley sound stage, tiered orchestra room, green screen studio and state-of-the-art editing suites. In terms of the overall design, the architects worked to preserve the existing structure by choosing a tension grid—to provide full access to the catwalk space — and display the original exposed beams, as opposed to a dropped acoustical baffled ceiling.

We have found that renovating existing theaters and repurposing them to fit today’s performing needs can be an effective way to meet both budget and program needs. Here are some elements to consider when renovating a performing arts center:

Use an Integrated Design Approach

There are countless factors to designing and building a theater, so getting key players together early in the design process is crucial for success. By gathering a team of designers, engineers, contractors and end users, you can identify the goals and priorities up front, resulting in cost and time savings in the end. For example, acoustics — a central component to theaters — requires all parties to play a role and collaborate.

  • Architects and interior designers consider finish selections, volume and style of the space.
  • Mechanical engineers cover sound isolation and HVAC delivery methods, affecting the background noise level.
  • Structural engineers lead the sound isolation of partitions, floors and roof, and seismic upgrades that may involve replacement of ceilings and walls.
  • Electrical engineers consider how to impact acoustics through sound and lighting control locations, fire alarms, paging/intercom systems and connect motorized curtains or sound absorbent panels to create a space better suited to drama or lecture presentations.

Performing Arts Center RenovationAt Wilson High School, also in Long Beach, the need to seismically retrofit the theater meant all disciplines needed to come together: structural engineering designed the roof and ceiling support, the architectural and interior designers worked with the acoustician to reshape the ceiling below the new supports, and worked with mechanical and electrical to weave the ductwork, diffusers, and lighting throughout.

Recognize the Building’s Inherent Characteristics

Today’s requirements for a theater are much more complex than theaters past. From lighting to seating, acoustics to accessibility, balancing the needs of today with important historical elements can set a performing arts center apart. From historical architectural features to interesting seating arrangements, keep an eye out for elements that exist within a building before demolishing a key component. Don’t eliminate the eccentricities; instead balance them with the needs of modern theater.

Identify the Function of the Space

Some schools may offer the space to the entire community, while others have a smaller facility that is specific to one extracurricular program. By understanding how the space will be used, and by whom, it’s easier to sift through the wide variety of options for acoustical, lighting and A/V.

Performing Arts Center RenovationUpgrade for Accessibility

Connecting spaces with multiple levels in older buildings can be challenging. Accessibility compliance standards have evolved to support wheelchair lifts, ramps and elevators providing equal access to the stage and multiple locations for seating. Strike a balance between adhering to these requirements, while maintaining the capacity for seating. Understand any code changes related to aisle and row width, exiting, and fire and life safety, so that you accommodate these changes without completely altering the number of seats available for guests.

Be Mindful of Sight Lines

Performing Arts Center RenovationOne of the most important parts of the guest experience is being able to easily see the stage. Maintaining sight lines — providing unobstructed views of the stage from wherever a guest is seated — is a challenging but necessary step in the design process. When working on an existing facility, it’s important to take existing and necessary structural elements into account. Identify where those structural elements are in the space and adjust accordingly.

As designers, it’s exciting to have seen a shift in prioritizing performing arts centers. A renovated facility can bring new life to performance spaces while providing professional opportunities and experiences for all students on campus.

This article originally appeared in the issue of .

About the Authors

Kristen van Elden, CID, LEED-AP, ID+C, is a design coordinator in the interior design studio at LPA Inc., an integrated design firm in California and Texas.

Emily Koch is a project designer in the interior design studio at LPA Inc., an integrated design firm in California and Texas.

Featured

  • Inglewood Unified School District Breaks Ground on New High School

    The Inglewood Unified School District in Inglewood, Calif., recently broke ground on a new campus for Inglewood High School, according to a news release. The project has a budget of about $240 million, funding coming through bond proceeds from Measure I.

  • Texas A&M Adds ALPR Technology to Parking Solutions

    Texas A&M University in College Station, Texas, recently integrated automatic license plate recognition (ALPR) technology into its parking services and enforcement strategies, according to a news release. The university’s Transportation Services division deployed Genetec AutoVu ALPR to manage the campus’ 36,000+ parking spaces.

  • UT-Austin Breaks Ground on 17-Story Business School

    The University of Texas at Austin recently broke ground on a new, 17-story facility that will serve as the new home for the school’s McCombs School of Business, according to university news. The groundbreaking ceremony took place on April 10 for Mulva Hall, which will include amenities like classrooms, academic department suites, research centers, faculty offices, the dean’s office, and gathering spaces.

  • S4L Launches 2025 Facilities and Construction Brief Survey

    Spaces4Learning recently launched its 2025 Facilities and Construction Brief Survey, which gathers information on K–12 and higher education construction projects nationwide from the previous year. The data we get from you, our readers, forms an industry report offering an overview of current trends in school facilities.

Digital Edition