Preparing for Emergencies

Performing drills disrupts the flow of an already-full school day. Without adding more time to the drill, how can schools ensure they are getting the most value from these activities?

Teach staff to initiate the drill. The principal typically announces a drill. But the person most likely to encounter an emergency, like a strange odor or a student with a knife, is actually a staff member. Teaching staff to initiate drills gives them the means and responsibility to help keep students safe.

Use scenarios to put the drill in context. When a real emergency hits, emotion and adrenaline will significantly affect how successfully everyone responds. Scenarios put drills in context and incorporate a level of emotion and adrenaline. For example, the principal hands a 6th grade math teacher the following scenario printed on an index card, “You’re in the middle of teaching a class when you and several students notice smoke and flames coming through the ceiling tiles just over your head. Go!” Now, it’s up to the teacher to respond and alert the building.

Assess the fidelity of your safety plan. In addition to preparing for various emergencies, drills tell you if your safety plan works. We’ve all encountered situations where what looks good on paper doesn’t hold up in a real scenario. Documenting lessons and modifying your safety plan is critical to ensuring a safe learning environment.

Putting drills in context and empowering staff to initiate them improves staff engagement, better preparing everyone to respond effectively during a drill or emergency. It ensures the right safety plan is in place, which is valuable.

This article originally appeared in the issue of .

About the Author

Thom Jones is the general manager of NaviGate Prepared. He can be reached at 740/963-3141.

Featured

  • Kenall Introduces Millenium Flair Series

    In a move aimed at modernizing institutional lighting without compromising on durability or performance, Kenall has launched its new Millenium Flair series, according to the Kenall website.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • Dallas ISD Debuts New Peabody Elementary School

    The Dallas Independent School District in Dallas, Texas, recently announced the completion of the new facility for George Peabody Elementary School, according to a news release. The district partnered with Pfluger Architects and REEDER Construction on the 70,807-square-foot replacement campus, which has the capacity for 550 students.

  • cutaway view of a modern school building, showing various rooms and zones

    Layering AI into HVAC Systems Shows Reduction in Carbon Emissions

    Heating and cooling systems are just one of the many new ways that AI can be integrated into schools. According to a new study from Schneider Electric's Sustainability Research Institute, AI-powered HVAC systems in schools can lead to significant carbon emissions savings.

Digital Edition