Student Victimization in U.S. Schools: Results From the 2015 School Crime Supplement to the National Crime Victimization Survey

Washington, D.C. — This report uses data from the 2015 School Crime Supplement (SCS) to the National Crime Victimization Survey (NCVS) to examine student criminal victimization and the characteristics of crime victims and nonvictims. It also provides findings on student reports of the presence of gangs and weapons and the availability of drugs and alcohol at school, student reports of bullying, and fear and avoidance behaviors of crime victims and nonvictims at school. To read the report, visit nces.ed.gov/pubsearch

Featured

  • Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

    The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.