How can we move to network-based communication?

Many schools rightly see network-based distributed communication—moving paging, intercom, and bells to the LAN away from separate hard-wired analog systems—as a way to increase efficiency, flexibility, safety, and even space. Replacing huge paging amps, redundant wiring, and 70-volt speakers with a server, a software interface, and a variety of flexible IP-addressable endpoints has numerous advantages. The most basic include giving office staff the power to set up different bell schedules for different zones, turn them off on the weekend, and make changes anytime with a few clicks.

Schools can also gain safety functionality they never had before: panic buttons in classrooms, silent alerts, and instant triggering of lockdowns and all-clears from the office or even a mobile device. Integrating all these methods of communication under a single platform is a big plus.

But it’s not an impulse buy. The time to move to a modern school communication platform isn’t when your current analog amp goes down. This takes planning—and not just at the individual school level.

Most districts want standardization throughout their schools. Clearly, continuing to standardize on 1960s technology is not acceptable, but making a sweeping district-wide upgrade to IP-based systems is daunting. A more realistic approach is to build the new digital standard into new construction projects, then bring older schools up to that IP-based standard over time. This ensures you’re designing for the future rather than digitizing old habits and forces a district-wide approach to daily communications and safety protocols you can implement methodically over a number of years.

It’s a big task, but very worthwhile, and fortunately there are experienced professionals to help you execute a successful plan.

This article originally appeared in the School Planning & Management April 2018 issue of Spaces4Learning.

About the Author

Jaime Mendez serves as architectural consultant at FrontRow. He can be reached at [email protected].

Featured

  • Kenall Introduces Millenium Flair Series

    In a move aimed at modernizing institutional lighting without compromising on durability or performance, Kenall has launched its new Millenium Flair series, according to the Kenall website.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • Dallas ISD Debuts New Peabody Elementary School

    The Dallas Independent School District in Dallas, Texas, recently announced the completion of the new facility for George Peabody Elementary School, according to a news release. The district partnered with Pfluger Architects and REEDER Construction on the 70,807-square-foot replacement campus, which has the capacity for 550 students.

  • cutaway view of a modern school building, showing various rooms and zones

    Layering AI into HVAC Systems Shows Reduction in Carbon Emissions

    Heating and cooling systems are just one of the many new ways that AI can be integrated into schools. According to a new study from Schneider Electric's Sustainability Research Institute, AI-powered HVAC systems in schools can lead to significant carbon emissions savings.

Digital Edition