Wofford College: Rosalind Sallenger Richardson Center for the Arts

Wofford College

PHOTOS © 2017 DERRICK SIMPSON–MCMILLAN PAZDAN SMITH ARCHITECTURE

Wofford College’s Rosalind Sallenger Richardson Center for the Arts is designed to enhance the student experience of a private liberal arts campus while serving the larger community from the edge of downtown Spartanburg, SC. McMillan Pazdan Smith Architecture designed the 60,000-square-foot facility to house academic programs in theatre arts, visual arts, and art history, as well as a museum home for Wofford’s permanent collection.

Floor-to-ceiling glazing fills the art studios with natural light, creates openness, and connects with the outdoors. Two custom-made glass sculptures by internationally renowned artist Dale Chihuly grace both the campus entrance lobby and the public entrance lobby, creating an inspired atmosphere for the student gallery, performance hall, and permanent museum spaces. An outdoor sculpture garden and the artistic material choices of white brick and cast stone, metal with copper tones, and glass set the building off from the traditional architecture of the campus.

The 325-seat performance hall features a 2,600-square-foot stage with high-performance theatrical lighting, rigging, and audiovisual systems. Acoustic performance was studied through detailed angle-measurement models and is controlled by a highly adjustable acoustic baffle system. The adjacent 100-seat black box theater features a custom suspension grid and serves as a laboratory for set lighting design education. Dressing rooms, additional seminar classrooms, faculty offices, a costume design studio, and a scenery construction woodshop support the theaters’ purpose as a “teaching theater.”

Housed in the same facility, the college’s newly launched Studio Art program is sized to accommodate 20-25 students at easels or drawing benches. The adjacent Ceramics Studio includes large work tables, potters’ wheels, and a kiln on the shared covered porch. Attention to fumes in the studios and temperature and humidity in the museum and art storage spaces required intense air quality protocols throughout the facility, including numerous dedicated units, tightly managed control systems, and careful attention to off-gassing of materials.

This article originally appeared in the College Planning & Management April 2018 issue of Spaces4Learning.

Featured

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.

  • Washington State University Debuts New Engineering Hall

    Washington State University recently celebrated a dedication ceremony for the new Schweitzer Engineering Hall on its Pullman campus in Pullman, Wash., according to university news. The facility measures 66,288 square feet, and its completion marks the first milestone in a larger university effort to modernize the engineering and design district.

  • Phoenix High School Completes First Phase of Campus Renovations

    Metro Tech High School, part of the Phoenix Union High School District (PXU) in Phoenix, Ariz., recently announced the completion of the first stage of a campus renovation project, according to a news release. The school reopened a series of public-facing business operations spaces including credit union, daycare, floral, cosmetology, and culinary services. It also includes new CTE learning spaces for the school’s nursing assistant, pharmacy, and sports medicine programs.

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.