How can we add gunshot detection to our facilities?

You will need to look at your facilities and identify what classrooms, hallways, entrances, and exits need to be covered. Decide how many sensors that you need. Each sensor will detect within a certain range; for example: 2,500 square feet. Indoor sensors will generally be placed in hallways and entrances at an absolute minimum because statistically shootings occur or start in the entrances or hallways. Place sensors in areas that have more people or where people congregate the most, because if a crime is going to be committed it generally will be focused in an area that has a larger populace. Examples would be in a lunch room or in a large open atrium area where a lot of people hang out.

Decide if you’ll be adapting your existing alarm panel or are you will need to put in an additional network system to support the sensors. Some sensors have integrated contact closures that can tie directly into your alarm panel, therefore minimizing the need for an additional new system. You also need to determine how you want the message to go out. Look for sensors that can provide IP message notification over SMS, email, and other notification means.

In considering a gunshot detection system for your facilities, the main focus is going to be the size of your buildings, the number of sensors that you want to put in those facilities in the high-traffic areas, and the message notification style, whether it’s alarm panel integration or and/or if it includes IP message notification.

This article originally appeared in the College Planning & Management May 2018 issue of Spaces4Learning.

About the Author

Allan Overcast is owner/CEO of Shot Tracer Technologies, Inc. (www.shottracer.com). He can be reached at [email protected] or 866/636-8867.

Featured

  • Kenall Introduces Millenium Flair Series

    In a move aimed at modernizing institutional lighting without compromising on durability or performance, Kenall has launched its new Millenium Flair series, according to the Kenall website.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • Dallas ISD Debuts New Peabody Elementary School

    The Dallas Independent School District in Dallas, Texas, recently announced the completion of the new facility for George Peabody Elementary School, according to a news release. The district partnered with Pfluger Architects and REEDER Construction on the 70,807-square-foot replacement campus, which has the capacity for 550 students.

  • cutaway view of a modern school building, showing various rooms and zones

    Layering AI into HVAC Systems Shows Reduction in Carbon Emissions

    Heating and cooling systems are just one of the many new ways that AI can be integrated into schools. According to a new study from Schneider Electric's Sustainability Research Institute, AI-powered HVAC systems in schools can lead to significant carbon emissions savings.

Digital Edition