Reuse or Rebuild?

learning environment

As in many older communities, school administrators in Brookline, Mass., faced rapidly-growing enrollment and inadequate, aging facilities, with no easy choices. One of the most difficult decisions was what to do with an aging elementary school complex anchored by a historically-significant and beloved 1913 Georgian-style brick schoolhouse that John F. Kennedy and four of his siblings attended.

Preserve or Not to Preserve, That Is the Question

At the heart of this dilemma was the initial question familiar to every community: “Can we reuse and renovate the existing building(s)?” The question is both an emotional and a practical one. A cherished school building is a significant piece of the social fabric of the neighborhood—a brick-and-mortar steward of stories and collective memories. In Brookline, schools have occupied the site where the Coolidge Corner School is now located since 1892, when the first of a series of academic buildings was built to frame the historic 1680 house of Edward Devotion, an important educational benefactor.

learning environment

A hybrid design blends modern learning environments with preservation.

Ultimately, the restoration-versus-new-construction decisions require a thorough balancing of the facts: condition, cost, and program issues must be considered along with the emotional and aesthetic issues. To help determine what is the best long-term solution, an experienced and objective study is needed to investigate all options, analyze the data, and develop scenarios for community stakeholders.

Structural Considerations

A starting point for considering restoration of an older building is its structure—particularly its walls, classroom layouts, and structural support system. The Coolidge Corner School, like many that we see, had the traditional double-loaded corridors with masonry walls and undersized classrooms. These are incredibly difficult structures to repurpose for today’s educational needs.

Renovation and reuse can be accomplished in early 20th-century buildings by selectively removing small sections of the walls to open-up space for larger classrooms. But to preserve the seismic integrity of the building, an equal section of the wall system may need to be newly-built nearby. This inhibits the options for creating flexible, open spaces for small-group learning.

learning environment

Historic artifacts were salvaged and incorporated into the new school.

Owners of older homes know that once walls and ceilings are removed within, a variety of conditions and unknowns await. It’s not unusual to discover hazardous materials, deterioration from water damage, and contamination from leaking oil tanks. Educating clients about the vagaries and risks of a historic renovation project is important, as is developing budgets and schedules that anticipate the unknown.

Hybrid Strategy Blends Old and New

In Brookline, a thorough process of review, discussion, and consensus-building led to a creative and functional solution. Reconciling the need for an expanded educational facility that would support modern pedagogies with the collective desire to preserve the architectural presence of the 1913 building, the community selected a hybrid design blending the future with the past.

This solution, bridging past and future generations, was achieved by renovating the centering historic building—an iconic focal point of the community—into a warm and welcoming entry that serves as the heart of the school and contains the administrative core. Two outdated and educationally inadequate wings, added in 1954 and 1974, were replaced with new academic spaces that meet the town’s educational goals and vision for the future. The formal arrangement of the school around the courtyard and Devotion House recalls the arrangement of the historical school complex and creates an inviting public space in Brookline’s Coolidge Corner neighborhood.

learning environment

Modern architecture blends within its historic context and campus.

A Conversation Between Generations

Restoring and repurposing historic portions of the existing building was not the only part of the conversation between generations. Artifacts from the prior school buildings that occupied the Coolidge Corner site were salvaged and are now prominently displayed in the school’s public spaces as teaching tools that connect students to the community history. A 1924 cornerstone, bas-relief sculptures, and commemorative panels honor past leaders of the school community and significant events from the town’s history.

Creative, Sustainable Solutions

Reusing an existing building necessitates creative thinking and problem solving. What is the highest and best use of existing spaces? What opportunities are there to connect the past and the present? With any historic preservation project or building reuse, challenges become opportunities for creative design responses. In addition to transforming the existing school to meet community and educational needs, the team identified ambitious goals for energy efficiency and the health and wellness of occupants.

learning environment

Connecting the 1913 building with a newly-constructed addition.

By working with an exterior envelope specialist to get maximum energy efficiency out of the existing masonry walls, reconfiguring and designing new interior spaces to maximize daylight, and using durable materials, the design team developed healthy spaces for teaching and learning. The 227,000-square-foot school is projected to achieve LEED Gold certification and be the most energy-efficient public school in the state.

Ultimately, the decisions on restoring, repurposing, or replacing beloved school buildings come down to an objective balancing of both the practical—cost, programming, schedule—with the sentimental pull of historical connections. It’s a process best informed by honest dialogue and a full revelation of the community’s future needs and vision.

This article originally appeared in the School Planning & Management March 2019 issue of Spaces4Learning.

About the Author

Pip Lewis, AIA, LEED-AP, is a principal with HMFH Architects in Cambridge, Mass. He can be reached at [email protected].

Featured

  • Illinois State University Breaks Ground on College of Fine Arts Transformation

    Illinois State University in Normal, Ill., recently held a groundbreaking ceremony for the Wonsook Kim College of Fine Arts transformation project, according to university news. The series of new constructions and renovations will upgrade spaces in Centennial East, the Center for the Visual Arts, and the Center for the Performing Arts, as well as replace the existing Centennial West facility with a new Commons Building.

  • Geometric abstract school illustration

    How Design Shapes Learning and Success

    Can the color of a wall, the curve of a chair, or the hum of fluorescent lights really affect how a student learns? More schools are beginning to think so.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • restroom sinks

    CSU Dominguez Hills Standardizes Plumbing to Improve Restroom Maintenance and Efficiency

    At California State University, Dominguez Hills, facilities leaders have taken steps to standardize restroom fixtures as part of a broader effort to improve maintenance efficiency and control long-term costs.