Delivering Around-the-Clock Power

gas generator

To ensure the power is always on, the Edward Via College of Osteopathic Medicine installed a Cat G3412 gas generator to back up the utility feed at the Auburn, AL, campus.

On a branch campus of Virginia Tech in Auburn, AL, the Edward Via College of Osteopathic Medicine (VCOM) opened its doors with a vision to provide healthcare for nearby underserved regions while promoting biomedical research. In a state-of-the-art building on the southern end of the Auburn campus, more than 325 VCOM first-and second-year students are taught the fundamentals of osteopathic medicine. VCOM’s curriculum is based on a digital platform so continuous power is critical.

To ensure uninterrupted power, VCOM installed a Cat G3412 gas generator to back up the utility feed at their Auburn campus when the building first opened. Based on a recommendation from Cat dealer Thompson Tractor, VCOM transfers the electrical load to the facility once a month.

“Every time, the generator has kicked right in and done what it’s supposed to do,” says Randy Cerovsky, facilities director for VCOM-Auburn. “We have never noticed any delay in the amount of time it takes for the generator to start up and transfer the power over. Everything just runs smoothly; we’ve never had any issues.”

Technicians from Thompson Power Systems perform regular maintenance on the generator set. “Thompson Power Systems has been great to work with,” Cerovsky says. “They do all of the service, and they explain everything.”

Cerovsky receives email alerts when the generator runs or if issues arise. “One of the features I like is the Cat Connect interface that enables us to receive SMTP alerts so if anything’s wrong, we get notified and call to receive service immediately.”

www.cat.com/en_US

This article originally appeared in the College Planning & Management September 2019 issue of Spaces4Learning.

Featured

  • Kenall Introduces Millenium Flair Series

    In a move aimed at modernizing institutional lighting without compromising on durability or performance, Kenall has launched its new Millenium Flair series, according to the Kenall website.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • Dallas ISD Debuts New Peabody Elementary School

    The Dallas Independent School District in Dallas, Texas, recently announced the completion of the new facility for George Peabody Elementary School, according to a news release. The district partnered with Pfluger Architects and REEDER Construction on the 70,807-square-foot replacement campus, which has the capacity for 550 students.

  • cutaway view of a modern school building, showing various rooms and zones

    Layering AI into HVAC Systems Shows Reduction in Carbon Emissions

    Heating and cooling systems are just one of the many new ways that AI can be integrated into schools. According to a new study from Schneider Electric's Sustainability Research Institute, AI-powered HVAC systems in schools can lead to significant carbon emissions savings.

Digital Edition