Santa Barbara School District Approves Renewable Energy Project

The Santa Barbara Unified School District unanimously approved a plan for a new energy initiative at its last school board meeting, reported the Santa Barbara Independent. If completed, the district will install solar energy, battery storage, and electrical vehicle charging stations at school sites districtwide.

With an increase in natural disasters and public safety power shutoffs in Santa Barbara, the district is considering a renewable energy infrastructure that would allow district schools to serve its community during emergencies. Community members would be able to come to school sites to charge devices, eat and store perishable foods, and if needed during an evacuation, the schools would be able to power the site for 3-5 days.

The school board approved the first six steps of this renewable energy project. The steps involved partnering with two environmental firms — Clean Coalition and Sage Energy Consulting — to complete a feasibility study by June 2020. If the project is financially feasible, the district will negotiate a power-purchase agreement with the firms, move forward with construction, and have all infrastructure and systems running by 2022.

The Clean Coalition has been designing community microgrids, which are like smaller versions of the electric grid but “can serve entire communities by providing indefinite renewables-driven resilience to the most critical community loads — and serve all loads for significant portions of time.” The project includes 18 prospective solar-driven microgrid and electric vehicle charging stations throughout the district.

The initial project management costs involved in the first six steps is $287,900 and is being paid from the State Facility Grant Matching funds.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • North Texas School District Completes Third New Elementary School

    The Denton Independent School District in Dallas, Texas, recently finished construction on its third prototype design elementary school, Reeves Elementary, according to a news release.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

Digital Edition