Bahamas IB School Opens New Academic Building

The Lyford Cay International Baccalaureate School, located in Nassau, The Bahamas, has opened its newest academic building to students. Designed by Cooper Robertson, the 35,000-square-foot Gateway Building will house 350 students from sixth through twelfth grade. The facility is also the first completed step—and the intended centerpiece—of a new 17-acre Upper School campus currently under development.

The Gateway Building features facilities for science, technology, engineering, arts, and mathematics (STEAM) instruction like teaching labs, music recital spaces, and art studios. The classic Bahamian architecture mixes indoor and outdoor learning spaces and offers cross-ventilation into interior spaces at a time when indoor air quality is of the utmost importance.

Lyford Cay International School Gateway Building

Each classroom is surrounded by a 12-foot veranda, and the building’s courtyards and landscaped grounds serve as additional teaching space. The indoor/outdoor hybrid environment was a deliberate choice on the architects’ part to promote student wellness and mental health.

“As one of the global educational community’s leading International Baccalaureate schools, LCIS has invested in a comprehensive and forward-looking campus vision that is a foundation of its continued success,” said John Kirk, AIA, partner at Cooper Robertson. “The Gateway Building exemplifies core principles of contemporary academic design: Great outdoor rooms, architecture that embraces its context and enhances the community, and innovative teaching facilities that respond to today’s students and administrators while anticipating the future."

The completed project also includes a free-standing, open-air dining pavilion; a gatehouse; fountains; and a compass rose. Principal David Mindorff called the project “an investment in a brighter vision for education in the Bahamas…These new facilities will allow us to continue providing the enriching learning experiences that have propelled LCIS forward from a small community school to a global leader in education.”

Future additions to the LCIS Upper School include a second academic building, athletics facilities, and a performing arts center. Renovations to the lower school like early learning classrooms and the construction of a 5,200-square-foot multipurpose building are also in the works.

Discussing the capabilities of the Gateway Building, Mindorff explained, “There are learning walls in each classroom that will allow teachers to work smoothly during technology-integrated lessons. The green spaces and forests of the campus are ideal for outdoor education and student-led environmental initiatives. Importantly, during the COVID-19 pandemic, having two campuses has allowed us to facilitate increased face-to-face opportunities for students.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • R.I. District Holds Ribbon-Cutting Ceremony for New Elementary School

    Cranston Public Schools in Cranston, R.I., recently announced the completion of Gladstone Elementary School, according to a news release. The 100,000-square-foot facility serves as a replacement for the 1950s-era former building, and it consolidates the student, faculty, and staff populations of Gladstone and Arlington Elementary Schools.

  • Missouri K–12 District Cuts Ribbons on Two New Middle Schools

    Springfield Public Schools in Springfield, Mo., recently celebrated the completion of two new middle school facilities with ribbon-cutting ceremonies, according to a district news release. The district officially opened the new Pipkin Middle School and Reed Academy on Sept. 3, both of which were funded through the $220-million Proposition S bond program approved by voters in 2023.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.