EXTECH Provides Skylight System to Calif. Middle School

EXTECH/Exterior Technologies, Inc. has provided skylight systems for the new Spring Hill School middle school campus in Sonoma County, Petaluma, Calif. The campus opened its doors to students for the first time for the 2019-20 school year. The middle school was designed by DMARC Studio, constructed by Advanced Building Solutions, and offers a variety of indoor and outdoor learning spaces for up to 120 students.

The building features a learning center / conference room, idea lab, math center, makerspace studio including a 3D printer, and indoor and outdoor learning classrooms. A covered walkway featuring EXTECH’s skylight system connects the outdoor learning spaces, providing daylight and ventilation to students. The SKYGARD 2500 Series skylight system covers an area about 168 feet long by 6 feet wide at a consistent slope of 1:12 across the entire span.

EXTECH skylight system
Photo by Kaplan Photo, courtesy of EXTECH

Each of its 55 panels come in a variety of sizes and are made of laminated glass more than half an inch thick and framed with anodized aluminum. The aluminum is made of recycled materials.

“Our skylights not only support sustainable daylight designs, but also provide a cost-effective choice for fabrication, installation and maintenance,” said EXTECH general manager Jim Leslie. “Backed with a 10-year warranty, our skylight system continues to add value for school districts, building owners and facility managers for years to come.”

The Spring Hill School opened in 1975 to offer a Montessori-based education to students in pre-kindergarten through fourth grade. The new middle school campus expands those opportunities through eighth grade. The program includes a distinct focus on humanities, science, technology, engineering, arts and math (STEAM). This educational style and STEAM focus influenced the inclusion of nontraditional learning spaces to increase flexibility and student health and offer an aesthetic touch.

“This challenge was approached by utilizing a unique structural system that not only provides flexibility for the instructional spaces within the building, but also provides a design aesthetic inspired by the STEAM curriculum when exposed,” said DMARC. “The classrooms’ connection to the outdoors provides unique educational spaces for the students and maximizes usable space.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Full Sail University Announces First Student Housing Facility

    Full Sail University in Winter Park, Fla., recently announced that development has begun on its first student housing community, according to a news release. The university is partnering with Nvision Development for construction and long-term management of the facility, which will stand five stories and have the capacity for more than 570 beds.

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.