New Ontario Tech University Academic Building Nears Completion

A new $48-million building on the campus of Ontario Tech University's north Oshawa campus will "respond" to sunlight and solar orientation. The project will deliver 80,000 square feet of new, technology-enhanced academic, administrative and student support spaces along with amenities and social spaces to the Ontario Tech Academic Building. The full building is 111,000 square feet.

The building exterior, which combines concrete, metal, wood and stone, uses four types of shaped concrete panels throughout the entire structure. According to co-designer Montgomery Sisam Architects, the concrete panels are angled in different ways, creating differences in light and shadow and weightlessness and mass in the interior spaces as the solar orientation shifts during the day.

University of Ontario Institute of Technology (UOIT) solar orientation building
The new general academic and student building at Ontario Tech University is designed to revolve around solar orientation.
Source: Montgomery Sisam Architects

Parts of the building were also designed to be more highly visible and transparent, while others were meant to be "more hidden and tucked away." The side that faces the campus quad, for example, is highly visible as people approach from the exterior. That's where public activities are meant to happen. On Levels 1 and 2, the student union, enhanced-learning, lounge and study spaces are arrayed around a large open atrium, activating the perimeter and animating the building frontages. A stairway leads to the high-traffic student club space and conference center in the lower-level. Levels three, four and five are intended for student life amenities, classrooms and administrative offices, as well as smaller social spaces for quieter study.

On the exterior, a plinth and canopy wrap around the building at the ground floor, according to the designers, "to create a human scale at the street level."

Montgomery Sisam was joined by Architecture Counsel, which led the project's initial business case and feasibility study through to project completion.

It was planned as a facility where the campus community could "come together to learn, collaborate and unwind," the university noted in its construction update. The goals were threefold: to encourage students, faculty and staff "to stick around because they want to be here"; apply the latest technology, to encourage "student-to-student learning"; and be as sustainable as possible.

The building will eventually house:

  • The Faculty of Health Sciences' lecture theaters, academic offices and labs, including a high-tech simulation lab that will provide access to 3D solutions and augmented and virtual reality;
  • The Office of Student Life and support services; and
  • Ontario Tech University Student Union.

Previously, the student union and student life operations were housed in portables.

The structure is expected to be completed "as close as possible" to the target date of fall 2021, the university stated.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Florida Elementary School to Undergo $47M Reconstruction

    The School District of Osceola County in Kissimmee, Fla., recently announced a partnership with construction firm Skanska to reconstruct Reedy Creek Elementary School, according to a news release. The $47-million project will involve the new construction of a 96,000-square-foot academic center, renovating the remaining facilities, a full-site redevelopment, and demolishing portions of the existing school.

  • Oregon Institute of Technology to Construct $35M Mass Timber Residence Hall

    Oregon Institute of Technology in Klamath Falls, Ore., recently announced the construction of a new, $35-million mass timber residence hall, according to college news. The facility will stand four stories, have room for 517 students, and cover 86,710 square feet to address the college’s need for more on-campus housing.

  • UTEP Celebrates Construction Milestone for New Academic Building

    The University of Texas at El Paso in El Paso, Texas, recently held a “topping out” ceremony for its new learning complex, Texas Western Hall, according to university news. The construction milestone marks the placement of the last beam of a structure in progress.

  • Massachusetts Charter School Opens New Academic Building

    The Advanced Math and Science Academy Charter School (AMSA) in Marlborough, Mass., recently held a ribbon-cutting ceremony for a new academic building, according to a news release. The 17,000-square-foot space will serve as a classroom and science lab building for the student population of almost a thousand in grades 6–12.